Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Euroklimat Water-Cooled Chiller IPE 51
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Water-Cooled Chiller Electrical Equipment Check
Pre-Inspection Safety Measures
Ensure the power on/off switch is set to off (position ‘0’) and padlocked.
Verify there are no moving parts.
Observe accident-prevention regulations in force.
Put on adequate personal protective equipment
Visual Inspection and General Cleaning
Conduct a thorough visual inspection of the equipment.
Perform general cleaning of the equipment.
Drive Belt Check
1 Monthly Water-Cooled Chiller Condensing Coil Check
Pre-Inspection Safety Measures
Ensure the power on/off switch is set to off (position ‘0’) and padlocked.
Verify there are no moving parts.
Observe accident-prevention regulations in force.
Put on adequate personal protective equipment
Visual Inspection and Cleaning
Open the upper front panel once the unit has stopped.
Press on the drive belt with fingers at the indicated points.
Visually check for dirt on the coil (e.g., paper, dry leaves, dust).
1 Yearly Water-Cooled Chiller Coil Cleaning
Pre-Inspection Safety Measures
Ensure the power on/off switch is set to off (position ‘0’) and padlocked
Verify there are no moving parts
Observe accident-prevention regulations
Wear adequate personal protective equipment
Visual Inspection and Initial Setup
Conduct a thorough visual inspection of the equipment
Open the upper front panel once the unit has stopped
Press on the drive belt with fingers at indicated points
1 Yearly Water-Cooled Chiller Maintenance
Pre-Inspection Safety Measures
Ensure the power on/off switch is set to off and padlocked in that position.
Verify that there are no moving parts.
Observe the accident-prevention regulations in force.
Put on adequate personal protective equipment
General Maintenance Guidelines
Ensure all operations except visual inspections are carried out by specialised personnel.
Contact Euroklimat for operations not contemplated in this manual.
Perform a thorough visual inspection of the equipment.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX