MaintainX Asset Hub logo
EnterprisePricing
Daikin

Daikin VRV X Series High-COP Type Air Conditioner RXQ38AHR

Need answers fast?
Explore the manual using AI.

Daikin VRV X Series High-COP Type Air Conditioner RXQ38AHR
Daikin VRV X Series High-COP Type Air Conditioner RXQ38AHR

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin VRV X Series High-COP Type Air Conditioner RXQ38AHR

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin VRV X Series High-COP Type Air Conditioner RXQ38AHR

Daikin VRV X Series High-COP Type Air Conditioner RXQ38AHR

Create an account to install this asset package.

Maintenance Plans for Daikin VRV X Series High-COP Type Air Conditioner Model RXQ38AHR

Integrate maintenance plans directly into your work orders in MaintainX.

Air Conditioner Test

Check mark

Warning: This test operation requires trained personnel with PPE!

Check mark

INFORMATION: It may take 10 minutes to achieve a uniform refrigerant state before the compressor starts.

Check mark

During the test operation, the refrigerant running sound or the magnetic sound of a solenoid valve may become loud and the display indication may change. These are not malfunctions.

Check mark

All front panels are closed

Check mark

All field settings are set

Check mark

Power to the outdoor unit and the connected indoor units is ON

Check mark

NOTICE: Be sure to turn on the power 6 hours before operation in order to protect the compressor

Check mark

Default (idle) situation is existing

Check mark

Push BS2 for 5 seconds or more. The unit will start test operation.

Run this procedureArrow right

Air Conditioner Test Operation Check

Check mark

Test Operation

Check mark

Is the temperature setting of the remote controller at the lowest level in cooling mode or in test mode?

Check mark

Checklist

Check mark

Is the operation lamp lit?

Check mark

Is the timer lamp off?

Check mark

Is the fan operating?

Check mark

Is the air from indoor unit cool?

Check mark

Is the air from outdoor unit warm?

Check mark

Is the air flow from the indoor unit stopped occasionally during operation?

Run this procedureArrow right

Fan Motor Connector Check

Check mark

Outdoor unit

Check mark

Power supply turned OFF

Check mark

Resistance between phases of U, V, W at the motor side connectors

Check mark

Values are balanced and there is no short circuiting

Check mark

Indoor unit: FXMQ50-140PB

Check mark

X1A connector removed from the fan PCB (A2P)

Check mark

Resistance between the U and V, V and W, and W and U phases of the motor connector

Check mark

Each phase are balanced (within a permissible dispersion range of ±20%)

Check mark

Fan Motor Connector Check (Signal Cable): CHECK 17 Resistance measuring points and judgment criteria.

Run this procedureArrow right

Power Transistor Check

Check mark

CHECK 4: Perform the following procedures prior to check.

Check mark

Power OFF

Check mark

All wiring removed from the PCB where power transistors are mounted on

Check mark

Preparation Multimeter

Check mark

Type of multimeter prepared

Check mark

Point of Measurement and Judgment Criteria

Check mark

Power supply turned OFF

Check mark

10 minutes or more passed since power supply turned OFF

Check mark

Measurement mode for analog multimeter

Run this procedureArrow right

Refrigerant Overcharge Check

Check mark

Warning: This check requires trained personnel with PPE!

Check mark

Enter the high pressure reading

Check mark

Is overload control conducted causing insufficient cooling capacity?

Check mark

Enter the superheating degree of suction gas

Check mark

Is the compressor lower in discharge pipe temperature despite of pressure loads?

Check mark

Enter the subcooling degree of condensate

Check mark

Is the subcooling degree of condensate high?

Check mark

Sign off on the refrigerant overcharge check

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets