MaintainX Asset Hub logo
EnterprisePricing
Daikin

Daikin Indoor Unit Multi-Split Type Air Conditioner CTXG12QVJUW

Need answers fast?
Explore the manual using AI.

Daikin Indoor Unit Multi-Split Type Air Conditioner CTXG12QVJUW
Daikin Indoor Unit Multi-Split Type Air Conditioner CTXG12QVJUW

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Indoor Unit Multi-Split Type Air Conditioner CTXG12QVJUW

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Indoor Unit Multi-Split Type Air Conditioner CTXG12QVJUW

Daikin Indoor Unit Multi-Split Type Air Conditioner CTXG12QVJUW

Create an account to install this asset package.

Maintenance Plans for Daikin Indoor Unit Multi-Split Type Air Conditioner Model CTXG12QVJUW

Integrate maintenance plans directly into your work orders in MaintainX.

Capacitor Voltage Check

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Main circuit checked for short circuit?

Check mark

Voltage between FU2 and DC–

Check mark

Voltage 50 V or less?

Check mark

Ensure firm contact between the multimeter probes and the test points.

Check mark

Sign off on the capacitor voltage check

Run this procedureArrow right

Electronic Expansion Valve Check

Check mark

EV connector correctly inserted in the PCB

Check mark

All EVs generate a latching sound after power cycle

Check mark

Continuity between pins 5 - 1, 5 - 2, 5 - 3, 5 - 4

Check mark

Outdoor unit PCB functional

Check mark

Good coil generates a latching sound when mounted in the EV unit

Check mark

Note: Latching sound varies depending on the valve type

Check mark

Sign off on the electronic expansion valve check

Run this procedureArrow right

Hall IC Check

Check mark

CDXS, FDXS Series

Check mark

1. Check the connector connection.

Check mark

2. With the power on, operation off, and the connector connected, check the following.

Check mark

(1) Output voltage of about 5 V between pins 1 and 3.

Check mark

(2) Generation of 3 pulses between pins 2 and 3 when the indoor fan motor is operating.

Check mark

If NG in step (1) -> Defective PCB -> Replace the PCB (control PCB).

Check mark

If NG in step (2) -> Defective Hall IC -> Replace the indoor fan motor.

Check mark

If OK in both steps (1) and (2) -> Replace the PCB (control PCB).;

Run this procedureArrow right

Indoor Fan Motor Connector Check

Check mark

CTXG, CTXS, FTXS, FVXS Series

Check mark

1. Check the connection of connector.

Check mark

2. Check motor power supply voltage output (pins 4 - 7).

Check mark

3. Check motor control voltage (pins 4 - 3).

Check mark

4. Check rotation command voltage output (pins 4 - 2).

Check mark

5. Check rotation pulse input (pins 4 - 1).

Check mark

FFQ Series

Check mark

1. Check the connection of connector.

Check mark

2. Check motor power supply voltage output (pins 5 - 8).

Run this procedureArrow right

Inverter Analyzer Check

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Is the power turned off?

Check mark

If power is not turned off, stop the procedure and turn off the power

Check mark

Is the charged voltage of the built-in smoothing electrolytic capacitor 10 VDC or below?

Check mark

If the charged voltage is above 10 VDC, wait until it drops to 10 VDC or below

Check mark

Are the terminals from the compressor removed?

Check mark

Are the terminals connected to the terminals of the inverter analyzer?

Check mark

Warning: Do not let the terminals (U,V,W) touch each other. High voltage is applied.

Check mark

Is the power transistor test operation activated from the outdoor unit?

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets