MaintainX Asset Hub logo
EnterprisePricing
Daikin

Daikin Singlezone Heating and Cooling Units RPS 072D

Need answers fast?
Explore the manual using AI.

Daikin Singlezone Heating and Cooling Units RPS 072D
Daikin Singlezone Heating and Cooling Units RPS 072D

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Singlezone Heating and Cooling Units RPS 072D

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Singlezone Heating and Cooling Units RPS 072D

Daikin Singlezone Heating and Cooling Units RPS 072D

Create an account to install this asset package.

Maintenance Plans for Daikin Singlezone Heating and Cooling Units Model RPS 072D

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Electrical Check

Check mark

Open all electrical disconnects and check all power wiring connections.

Check mark

Start at the power block and check all connections through all components to and including the compressor terminals.

Check mark

These should be checked again after 3 months of operation and at least annually thereafter.;

Run this procedureArrow right

Condensing Unit Routine Maintenance

Check mark

Disconnect all electric power to the unit when servicing control panel components.

Check mark

Before servicing, always inspect units for multiple disconnects to ensure all power is removed from the control panel and its components.

Check mark

Danger! Hazardous voltage. Will cause severe injury or death. Disconnect electric power before servicing equipment. More than one disconnect may be required to de-energize the unit.

Check mark

Planned Maintenance: Preventive maintenance is the best way to avoid unnecessary expense and inconvenience. Have this system inspected at regular intervals by a qualified service technician.

Check mark

The required frequency of inspections depends upon the total operating time and the indoor and outdoor environmental conditions.

Check mark

Tighten all wire connections.

Check mark

Clean condenser coils with cold water, if necessary.

Check mark

Check each circuit’s refrigerant sightglass when the circuit is operating under steady-state, full-load conditions.

Check mark

Check for proper superheat.

Run this procedureArrow right

Manual Motor Protector Maintenance

Check mark

Warning: Unauthorized trip point or setpoint adjustment voids all or portions of the unit’s warranty.

Check mark

Short circuit indicator functional

Check mark

MMP trip points are factory set

Check mark

Authorized setpoint adjustment

Check mark

Motor service factor

Check mark

Motor FLA

Check mark

Resetting a tripped MMP

Check mark

MMP knob rotated counterclockwise to the OFF position

Check mark

MMP knob rotated clockwise to the ON position

Run this procedureArrow right

Cooling Circuits Maintenance

Check mark

The steps below are necessary only if the unit has been started.

Check mark

Each circuit is properly pumped down.

Check mark

Compressor MMP(s) turned off.

Check mark

All the refrigerant service valves on each circuit are closed.

Check mark

Valves are tagged as a warning for the technician who restarts the units.

Check mark

Sign off on the cooling circuits maintenance

Run this procedureArrow right

Scroll Compressor Piping Maintenance

Check mark

Scroll Compressor Piping

Check mark

When replacing an individual scroll compressor on tandem or trio assemblies, three refrigerant lines must be disconnected and re-assembled:

Check mark

1. TPTL Oil Equalization Line

Check mark

a. This line (Figure 23) contains the oil sight glass.

Check mark

b. This line connects to each compressor at “rota-lock” fittings (Figure 24).

Check mark

c. This line should be disconnected and re-used

Check mark

2. Suction Line

Check mark

a. This is the largest diameter piping.

Check mark

b. This line is brazed to each compressor.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets