MaintainX, an Autodesk company
EnterprisePricing
Bell & Gossett

Bell & Gossett Pump 90-3S

Need answers fast?
Explore the manual using AI.

Bell & Gossett Pump 90-3S
Bell & Gossett Pump 90-3S

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Bell & Gossett Pump 90-3S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Bell & Gossett Pump 90-3S

Bell & Gossett Pump 90-3S

Create an account to install this asset package.

Maintenance Plans for Bell & Gossett Pump Model 90-3S

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Periodic Inspection

Check mark

5.5 Pump operation precautions

Check mark

Control capacity only with the discharge-side regulating valve

Check mark

Watch for driver overload

Check mark

Operate the pump at or near rated conditions

Check mark

Check for excessive vibration

Check mark

Confirm that an idle pump exposed to freezing conditions has been fully drained of liquid

Run this procedureArrow right

Motor Bearing Lubrication

Check mark

5.2 Lubrication requirements

Check mark

Check motor size and lubrication requirements

Check mark

Use lubricant suited for motor bearings

Check mark

Record manufacturer's nameplate instructions for lubrication

Run this procedureArrow right

Pump Maintenance

Check mark

6.1 Disassembly

Check mark

Safety Precautions

Check mark

Replace the stationary insert and rotating seal assembly as a set

Check mark

6.1.2 Drain the pump

Check mark

Disconnect and lock out the electrical supply

Check mark

Remove the conduit box cover and disconnect the conduit and wiring

Check mark

Close the suction and discharge isolation valves

Check mark

Is the system drained if no isolation valves are installed?

Check mark

Open the drain valve and wait until liquid stops flowing

Run this procedureArrow right

Initial Pump Startup Check

Check mark

5.1 Preparation for startup

Check mark

Flush and clear the piping system of dirt or debris before startup.

Check mark

Bring variable-speed drivers up to rated speed as quickly as possible.

Check mark

If the pumped fluid will exceed 200°F (93°C), warm up the pump by circulating a small amount of fluid until the casing temperature is within about 100°F (38°C) of the fluid temperature.

Check mark

5.1.1 Check the rotation

Check mark

Unlock power to the driver.

Check mark

Confirm the area is clear and briefly jog the driver to verify the direction of rotation matches the arrow on the pump body.

Check mark

Is the rotation correct (clockwise when viewed from the back of the motor)?

Check mark

Lock out power to the driver again once rotation is confirmed.

Run this procedureArrow right

3 Monthly Shaft Storage Maintenance

Check mark

2.3 Long-term storage

Check mark

Storage Conditions

Check mark

Store the pump in a covered, dry location.

Check mark

Keep the unit free of heat, dirt, and vibration.

Check mark

Shaft Rotation

Check mark

Turn the shaft by hand several times.

Check mark

Repeat this rotation at least once every three months while the unit remains in storage.

Run this procedureArrow right

Parts for Bell & Gossett Pump 90-3S

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Lubricant

L23401

Lubricant

L23401

Lubricant

L23401

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Bell & Gossett

Explore Other Assets