RECLAIM LINE 051 WEEKLY Preventive Maintenance
The Reclaim Line 051 Weekly Preventive Maintenance (PM) procedure provides step-by-step inspection and servicing guidelines to ensure the safe and reliable operation of the reclaim line equipment. This procedure is designed to identify wear, leaks, and potential failures before they result in unplanned downtime.
RECLAIM LINE 051 WEEKLY Preventive Maintenance
The Reclaim Line 051 Weekly Preventive Maintenance (PM) procedure provides step-by-step inspection and servicing guidelines to ensure the safe and reliable operation of the reclaim line equipment. This procedure is designed to identify wear, leaks, and potential failures before they result in unplanned downtime.
LOCKOUT/TAGOUT PROCEDURES MUST BE FOLLOWED AT ALL TIMES
APPROPRIATE PPE MUST BE WORN AT ALL TIMES
IF ANY PROBLEM ARISES DURING PM CHECK THAT CANNOT BE REPAIRED AT THE TIME OF PM, ENTER A SEPERATE WORK ORDER FOR REPAIR AND LET YOUR LEAD MAINTENANCE TECHNICIAN KNOW
CHECK HYDRAULIC RESERVOIR LEVEL ON SHREDDER, FILL AS REQUIRED
CHECK FOR ANY LEAKS ON TANK, VALVES, HOSES OR CYLINDERS, REPAIR AS REQUIRED, IF IT CANNOT BE REPAIRED AT PM TIME, ENTER ADDITIONAL WORK ORDER FOR REPAIRS
CHECK SHREDDER GEAR BOX OIL LEVEL, FILL AS REQUIRE
CHECK SHREDDER GEAR BOX FOR ANY LEAKS, REPAIR AS REQUIRED
GREASE SHREDDER BEARINGS, 3 TO 4 PUMPS, CLEAN GREASE FITTING
CHECK FOR PROPER COOLING ON SHREDDER ROTOR, LEAKS, SIGHT GLASSES WORKING
CHECK SHREDDER SCREEN FOR CONDITION, REPLACE AS REQUIRED
CHECK SHREDDER SCREEN DOOR, GOOD CONDITION, LIFT SUPPORTS WORKING, LATCH WORKING
CHECK SHREDDER BLADE CONDITION, CUTTING, BROKEN, MISSING, BED KNIVES GOOD, IF NOT ENTER WORK ORDER TO SCHEDULE REPLACEMENT
CHECK SHREDDER RAM FOR CONDITION, ANY BROKEN, BENT, MISSING PIECES, REPAIR AS REQUIRED
CHECK SHREDDER SAFETY SWITCHES, REPAIR AS REQUIRED
CHECK CONVEYOR BELT FOR CONDITION, TRACKING, CLEATS, TRACK OR REPAIR AS REQUIRED
CHECK CONVEYOR GEARBOX OIL LEVEL, FILL AS REQUIRED
CHECK CONVEYOR GEARBOX MOUNTING FOR SECURITY, REPAIR AS REQUIRED.
CHECK SCREENCHANGER HYDRAULIC RESERVOIR, FILL AS REQUIRED
CHECK FOR ANY HYDRAULIC LEAKS, REPAIR AS REQUIRED
CHECK EXTRUDER GEAR BOX OIL LEVEL, FILL AS REQUIRED
CHECK VERTICAL AND HORIZONTAL AUGER GEARBOXES OIL LEVEL, FILL AS REQUIRED
CHECK ALL HEATS FOR PROPER TEMPERATURES, REPAIR AS REQUIRED
CHECK FOR PROPER WATER FLOW FROM PELLETIZER TO SPIN DRYER, LEAKS, REPAIR AS REQUIRED
COMMENT
DATE
TECHNICIANS SIGNATURE
Click here to sign
Source: Amcor - PRY (Community Member)