RECLAIM LINE 051 WEEKLY Preventive Maintenance

The Reclaim Line 051 Weekly Preventive Maintenance (PM) procedure provides step-by-step inspection and servicing guidelines to ensure the safe and reliable operation of the reclaim line equipment. This procedure is designed to identify wear, leaks, and potential failures before they result in unplanned downtime.
Amcor - PRY
08/28/2025

RECLAIM LINE 051 WEEKLY Preventive Maintenance

The Reclaim Line 051 Weekly Preventive Maintenance (PM) procedure provides step-by-step inspection and servicing guidelines to ensure the safe and reliable operation of the reclaim line equipment. This procedure is designed to identify wear, leaks, and potential failures before they result in unplanned downtime.

    LOCKOUT/TAGOUT PROCEDURES MUST BE FOLLOWED AT ALL TIMES

    APPROPRIATE PPE MUST BE WORN AT ALL TIMES

    IF ANY PROBLEM ARISES DURING PM CHECK THAT CANNOT BE REPAIRED AT THE TIME OF PM, ENTER A SEPERATE WORK ORDER FOR REPAIR AND LET YOUR LEAD MAINTENANCE TECHNICIAN KNOW

    CHECK HYDRAULIC RESERVOIR LEVEL ON SHREDDER, FILL AS REQUIRED

    • Pass
    • Flag
    • Fail

    CHECK FOR ANY LEAKS ON TANK, VALVES, HOSES OR CYLINDERS, REPAIR AS REQUIRED, IF IT CANNOT BE REPAIRED AT PM TIME, ENTER ADDITIONAL WORK ORDER FOR REPAIRS

    • Pass
    • Flag
    • Fail

    CHECK SHREDDER GEAR BOX OIL LEVEL, FILL AS REQUIRE

    • Pass
    • Flag
    • Fail

    CHECK SHREDDER GEAR BOX FOR ANY LEAKS, REPAIR AS REQUIRED

    • Pass
    • Flag
    • Fail

    GREASE SHREDDER BEARINGS, 3 TO 4 PUMPS, CLEAN GREASE FITTING

    • Pass
    • Flag
    • Fail

    CHECK FOR PROPER COOLING ON SHREDDER ROTOR, LEAKS, SIGHT GLASSES WORKING

    • Pass
    • Flag
    • Fail

    CHECK SHREDDER SCREEN FOR CONDITION, REPLACE AS REQUIRED

    • Pass
    • Flag
    • Fail

    CHECK SHREDDER SCREEN DOOR, GOOD CONDITION, LIFT SUPPORTS WORKING, LATCH WORKING

    • Pass
    • Flag
    • Fail

    CHECK SHREDDER BLADE CONDITION, CUTTING, BROKEN, MISSING, BED KNIVES GOOD, IF NOT ENTER WORK ORDER TO SCHEDULE REPLACEMENT

    • Pass
    • Flag
    • Fail

    CHECK SHREDDER RAM FOR CONDITION, ANY BROKEN, BENT, MISSING PIECES, REPAIR AS REQUIRED

    • Pass
    • Flag
    • Fail

    CHECK SHREDDER SAFETY SWITCHES, REPAIR AS REQUIRED

    • Pass
    • Flag
    • Fail

    CHECK CONVEYOR BELT FOR CONDITION, TRACKING, CLEATS, TRACK OR REPAIR AS REQUIRED

    • Pass
    • Flag
    • Fail

    CHECK CONVEYOR GEARBOX OIL LEVEL, FILL AS REQUIRED

    • Pass
    • Flag
    • Fail

    CHECK CONVEYOR GEARBOX MOUNTING FOR SECURITY, REPAIR AS REQUIRED.

    • Pass
    • Flag
    • Fail

    CHECK SCREENCHANGER HYDRAULIC RESERVOIR, FILL AS REQUIRED

    • Pass
    • Flag
    • Fail

    CHECK FOR ANY HYDRAULIC LEAKS, REPAIR AS REQUIRED

    • Pass
    • Flag
    • Fail

    CHECK EXTRUDER GEAR BOX OIL LEVEL, FILL AS REQUIRED

    • Pass
    • Flag
    • Fail

    CHECK VERTICAL AND HORIZONTAL AUGER GEARBOXES OIL LEVEL, FILL AS REQUIRED

    • Pass
    • Flag
    • Fail

    CHECK ALL HEATS FOR PROPER TEMPERATURES, REPAIR AS REQUIRED

    • Pass
    • Flag
    • Fail

    CHECK FOR PROPER WATER FLOW FROM PELLETIZER TO SPIN DRYER, LEAKS, REPAIR AS REQUIRED

    • Pass
    • Flag
    • Fail

    COMMENT

    DATE

    TECHNICIANS SIGNATURE

    Click here to sign
Source: Amcor - PRY (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.