Monthly Bag House Inspection
This procedure outlines the steps for a weekly inspection of the Bag House, including pre-inspection safety checks, visual and operational checks, compressed air system inspection, drum and material handling, general inspection, and post-inspection documentation.
Monthly Bag House Inspection
This procedure outlines the steps for a weekly inspection of the Bag House, including pre-inspection safety checks, visual and operational checks, compressed air system inspection, drum and material handling, general inspection, and post-inspection documentation.
Visual and Operational Checks
Check for any visual alarms on top of cabinet
Record Differential Pressure (dp) from magnehelic gauge
Meter name
Unit
Is the Differential Pressure within the nominal operating range of 0.6kpa to 1.1kpa?
Inspect and record Hopper Temperatures
Inspect and Ensure Hopper heating element is working correctly
Inspect and record No.1 Plummer Block Bearing Temperature
Meter name
Unit
Inspect and record No.2 Plummer Block Bearing Temperature
Meter name
Unit
Compressed Air System
Record compressed air pressure
Meter name
Unit
Check compressed air system for leaks and organize repair if required
Check compressed air filter trap and drain water if required
Drum and Material Handling
Check drums for moisture and level, replace if required
General Inspection
Check for any abnormal noises, leaks, or vibration
Ensure all guards and covers are in position
Post-Inspection
Comments / Issues
Signature
Click here to sign
Source: Hexham NSW - Valmont Coatings - APAC (Community Member)