STRETCH QUARTERLY PM-OIL SAMPLES
This procedure is used to collect oil samples from each extruder gearbox on the listed production lines and record the date and technician signature, so that early signs of wear or contamination can be detected before they cause failures.
STRETCH QUARTERLY PM-OIL SAMPLES
This procedure outlines the steps for conducting Stretch Quarterly Preventive Maintenance oil sampling on all designated extruder gearboxes across specified production lines. This procedure ensures oil samples are collected and sent for analysis to monitor lubricant condition, detect early signs of wear or contamination, and prevent unplanned equipment downtime.
LINE 101
LINE 102
LINE 103
LINE 108
LINE 104
LINE 105
LINE 109
LINE 110
LINE 106
DATE
TECHNICIAN SIGNATURE
Click here to sign
Source: Amcor - PRY (Community Member)
