Monthly Fusion Splicer Inspection
A monthly inspection of the fusion splicer to evaluate electrode condition, V-groove cleanliness, camera functionality, and calibration accuracy, ensuring consistent and precise fiber optic splicing performance and minimizing the risk of splice quality deviations or equipment failures during operation.
Monthly Fusion Splicer Inspection
This procedure provides the steps for performing a monthly inspection of the fusion splicer by reviewing splice counts and assessing the condition of the electrodes. Replace electrodes or arrange servicing when required to maintain splice quality, equipment reliability, and consistent production performance.
Check Splice Count
Enter splice count found in the top left corner of the screen.
Replace electrodes
Only replace electrodes if splice count is >5000 (or PE to assess condition of electrode after 5 months)
Electrode requires replacement?
PE to assess if Electrode needs to be replaced internally or the splicer needs to be sent out for servicing.
Any other observations?
Source: Advanced Navigation (Community Member)