Back

Monthly Fusion Splicer Inspection

A monthly inspection of the fusion splicer to evaluate electrode condition, V-groove cleanliness, camera functionality, and calibration accuracy, ensuring consistent and precise fiber optic splicing performance and minimizing the risk of splice quality deviations or equipment failures during operation.
Advanced Navigation
08/05/2026

Monthly Fusion Splicer Inspection

This procedure provides the steps for performing a monthly inspection of the fusion splicer by reviewing splice counts and assessing the condition of the electrodes. Replace electrodes or arrange servicing when required to maintain splice quality, equipment reliability, and consistent production performance.

    Check Splice Count

    Enter splice count found in the top left corner of the screen.

    • 1000002747.JPG

    Replace electrodes

    Only replace electrodes if splice count is >5000 (or PE to assess condition of electrode after 5 months)

    Electrode requires replacement?

    PE to assess if Electrode needs to be replaced internally or the splicer needs to be sent out for servicing.

    Any other observations?

Source: Advanced Navigation (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.