033 - Post IAC Walkthrough
The 033 - Post IAC Walkthrough procedure involves a detailed inspection conducted after the completion of the Initial Acceptance Check (IAC) to verify that all systems and components meet operational standards. This walkthrough ensures any discrepancies or issues are identified and addressed before final acceptance, ensuring the equipment is fully functional and ready for use.
033 - Post IAC Walkthrough
The 033 - Post IAC Walkthrough procedure involves a detailed inspection conducted after the completion of the Initial Acceptance Check (IAC) to verify that all systems and components meet operational standards. This walkthrough ensures any discrepancies or issues are identified and addressed before final acceptance, ensuring the equipment is fully functional and ready for use.
Post-Assessment
Followed up with IAC for additional info (if needed)
IAC teams shared Data logger raw data
Add or drag pictures
Follow up
Reviewed report with engineering lead and sales
Add or drag pictures
Requested additional quotes (if needed)
Add or drag pictures
DOE-IAC Implementation Grant Application Submitted (following DOE guidelines)
Add or drag pictures
Sign Off
Click here to sign
Source: Wasmer Company (Community Member)