The 033 - Post IAC Walkthrough procedure involves a detailed inspection conducted after the completion of the Initial Acceptance Check (IAC) to verify that all systems and components meet operational standards. This walkthrough ensures any discrepancies or issues are identified and addressed before final acceptance, ensuring the equipment is fully functional and ready for use.
Wasmer Company
05/16/2025

033 - Post IAC Walkthrough

The 033 - Post IAC Walkthrough procedure involves a detailed inspection conducted after the completion of the Initial Acceptance Check (IAC) to verify that all systems and components meet operational standards. This walkthrough ensures any discrepancies or issues are identified and addressed before final acceptance, ensuring the equipment is fully functional and ready for use.

    Post-Assessment

    Followed up with IAC for additional info (if needed)

    IAC teams shared Data logger raw data

    Add or drag pictures

    Follow up

    Reviewed report with engineering lead and sales

    Add or drag pictures

    Requested additional quotes (if needed)

    Add or drag pictures

    DOE-IAC Implementation Grant Application Submitted (following DOE guidelines)

    Add or drag pictures

    Sign Off

    Click here to sign
Source: Wasmer Company (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.