Machine Reloaction
This procedure outlines the steps required to safely and efficiently relocate machinery within the facility. It ensures proper planning, equipment handling, and documentation to minimize downtime and protect assets.
Machine Reloaction
This procedure outlines the steps required to safely and efficiently relocate machinery within the facility. It ensures proper planning, equipment handling, and documentation to minimize downtime and protect assets.
Pre-Move Prep
Did you Verify machine is powered down and lockout/tagout applied at disconnect
Machine Movement
Set-Back and Re-Energize
Did you Reconnect electrical and all fluid lines
Post-Move Verification
Safety Manager Sign-Off
Safety Manager’s signature is required in the sign-off box to confirm all energy sources are reconnected, guards are in place, and the area is safe for operation before closing the work order.
Click here to sign
Source: Tyden Brooks (Community Member)