500-Hour Service for 30k Blower

It proactively prevents costly breakdowns and catastrophic failures by catching wear early, ensuring the blower operates reliably at peak efficiency for its full service life. This maintenance directly protects your significant capital investment and avoids expensive downtime.
MiAlgae Ltd
10/20/2025

500-Hour Service for 30k Blower

It proactively prevents costly breakdowns and catastrophic failures by catching wear early, ensuring the blower operates reliably at peak efficiency for its full service life. This maintenance directly protects your significant capital investment and avoids expensive downtime.

    Pre-Job Considerations

    Points to consider before Job Start

    Is this Work Scope to be done in conjunction with other Work Scopes?

    • Yes
    • No
    • N / A
    if the answer is "oneOf [Yes]"

    Which Work Scopes are being done in Conjunction?

    if the answer is "oneOf [Weekly Inspection]"

    30k Blower Weekly Inspection

    Tasks / checks to be done on a weekly (7-day) basis for the ATALS COPCO 30k Blower

    Pre-Job

    To be done before work starts

    Safety

    Gather Needed Tools & Materials

    Does Equipment Start when LOTO is applied?

    • Yes
    • No
    • N / A
    if the answer is "oneOf [Yes]"

    Investigate LOTO appliance!

    Work Scope

    Step-by-step of work scope.

    General Inspection & Cleaning

    Connection Checks

    Oil Level

    Is the Oil Level within acceptable range?

    • Yes
    • No
    • N / A
    if the answer is "oneOf [No]"

    Establish reason for Low Oil Level

    if the answer is "allOf [Investigate reason for Low Oil Level,Rectify Fault - if not possible, inform Maintenance Lead / Management.,Clean any Oil leakage within compartment,Remove Oil Fill Cap and replace lost Oil (ROTO-Z) Oil,Replace Oil Fill Cap]"

    Is the OIL FILL CAP Secured?

    • Yes
    • No
    • N / A

    Post-Job

    Tasks to be done AFTER completion of Work Scope

    Operation Check

    Hand Back

    Final Admin

    The above Procedure and associated Work Scope has been completed as per the steps provided.

    Click here to sign

    Pre-Job

    To be done before work starts

    Gather Needed Equipment

    Safety

    Does Equipment Start when LOTO is applied?

    • Yes
    • No
    • N / A
    if the answer is "oneOf [Yes]"

    Investigate LOTO appliance!

    Work Scope

    Step-by-step of work scope

    Compartment Cleaning

    Oil Cooler Inspection

    Air Inlet Filter

    Gearcase Breather

    Electric Motor

    Blow Off Valve

    Post-Job

    Work to be done AFTER Job Scope is finished.

    Operation Check

    Hand Back

    Final Admin

    The above Procedure and associated Work Scope has been completed as per the steps provided.

    Click here to sign
Source: MiAlgae Ltd (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.