Back

Stretch Line 105 Weekly Preventative Maintenance

Performing maintenance tasks on a weekly basis ensures that machinery and systems remain in peak working condition. By checking for wear, lubrication needs, loose parts, or calibration issues, organizations can reduce the risk of unexpected breakdowns. This proactive approach improves uptime and minimizes disruptions to production or services.
Amcor - PRY
08/13/2025

Stretch Line 105 Weekly Preventative Maintenance

Performing maintenance tasks on a weekly basis ensures that machinery and systems remain in peak working condition. By checking for wear, lubrication needs, loose parts, or calibration issues, organizations can reduce the risk of unexpected breakdowns. This proactive approach improves uptime and minimizes disruptions to production or services.

    Check all bearings for plastic buildup

    • Pass
    • Flag
    • Fail

    Check correct operation of scrap winder, repair as req

    • Pass
    • Flag
    • Fail

    Check hydraulic reservoir levels, fill as req

    • Pass
    • Flag
    • Fail

    Check resin pump oil levels, fill or replace as req

    • Pass
    • Flag
    • Fail

    Check resin pump filter, clean/replace as req

    • Pass
    • Flag
    • Fail

    Check blender operation and condition, recalibrate as req

    • Pass
    • Flag
    • Fail

    Check for any air leaks on complete line, repair as req

    • Pass
    • Flag
    • Fail

    Check for any oil leaks on line, repair as req

    • Pass
    • Flag
    • Fail

    Check extruder gearbox levels, fill as req

    • Pass
    • Flag
    • Fail

    Check auger gearbox levels, fill as req

    • Pass
    • Flag
    • Fail

    Verify proper operation of screenchangers-leaks

    • Pass
    • Flag
    • Fail

    Verify winder proximity switches are working, repair as req

    • Pass
    • Flag
    • Fail

    Verify position/operation of chuck proximity switches

    • Pass
    • Flag
    • Fail

    Verify belt conditions and alignment

    • Pass
    • Flag
    • Fail

    Check spindles for damage, wear and function, repair as req

    • Pass
    • Flag
    • Fail

    Check winder gearboxes and couplings for wear, repair as req

    • Pass
    • Flag
    • Fail

    Check grinder, repair as req

    • Pass
    • Flag
    • Fail

    Check rotator heats, verify correct temp, repair as req

    • Pass
    • Flag
    • Fail

    Check die and rotator electrical connnection, repair as req

    • Pass
    • Flag
    • Fail

    Check air ring hoses, repair/replace as req

    • Pass
    • Flag
    • Fail

    Check ibc hoses, repair/replace as req

    • Pass
    • Flag
    • Fail

    Check idler rollers from winder to tower, repair as req

    • Pass
    • Flag
    • Fail

    Check tower nip gearbox, chain, belt, sprockets, repair as req

    • Pass
    • Flag
    • Fail

    Check condition of tower nip and winder nip, repair as req

    • Pass
    • Flag
    • Fail

    If an item requires repair and needs to be scheduled, enter it as a separate work order so it can be addressed in a timely matter. if it is a safety concern, shut equipment down and repair immediately. either way enter repair work order # in the space above and explain in comments what was done

    Completion

    Comments

    Technician

    Click here to sign
Source: Amcor - PRY (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.