Changeover Checklist

This procedure is used to perform a production line changeover systematically, confirming that tooling, materials, and machine settings match the bag specification sheet (BMS) before the new run starts.
Rapak
02/23/2026

Changeover Checklist

This procedure outlines the steps for changing over a bag-making production line from one job to the next, so the line runs safely and on target. It guides operators through pre-changeover setup, material loading, machine adjustments, packing preparation, and quality qualification, ending with maintenance, changeover manager, and quality sign-offs.

    Pre changeover- Do this before you start changeover

    COM-Line Material

    COM-Line Prep (While waiting for material)

    COM-New Material

    COM-Machine Adjustments

    MO+Packer Packing side prep

    COM-Quality Qualification

    Maintenance Verification

    Sign both maintenance and COM if you are maintenance

    Click here to sign

    COM- Changeover Manager (the person doing the changeover)

    Click here to sign

    Quality verification

    Bag Qualified

    Click here to sign

    Do you have any suggestions/comments/ questions about the checklist/procedure? Please enter them in the text field below

Source: Rapak (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.