Changeover Checklist
The purpose of the Changeover Checklist is to ensure that all critical steps of the production line changeover are performed systematically, minimizing downtime and preventing errors. By following this checklist, operators and support staff can verify that all tooling, materials, and machine settings align with the specifications outlined in the BMS (Bag Manufacturing Standards) and related setup documents.
Changeover Checklist
The purpose of the Changeover Checklist is to ensure that all critical steps of the production line changeover are performed systematically, minimizing downtime and preventing errors. By following this checklist, operators and support staff can verify that all tooling, materials, and machine settings align with the specifications outlined in the BMS (Bag Manufacturing Standards) and related setup documents.
Pre changeover- Do this before you start changeover
Lines 3,6,7 Changeover Setup Sheet
COM-Line Material
COM-Line Prep (While waiting for material)
COM-New Material
COM-Machine Adjustments
MO+Packer Packing side prep
COM-Quality Qualification
Maintenance Verification
Sign both maintenance and COM if you are maintenance
Click here to sign
COM- Changeover Manager (the person doing the changeover)
Click here to sign
Quality verification
Bag Qualified
Click here to sign
Do you have any suggestions/comments/ questions about the checklist/procedure? Please enter them in the text field below
Source: Rapak (Community Member)