INTERCEPT WEEKLY ON

Complete this weekly check to keep the INTERCEPT system's components running safely and reliably.
Northeast Building Products
01/29/2026

INTERCEPT WEEKLY ON

This weekly inspection procedure ensures the safe and reliable operation of the INTERCEPT system by verifying the condition and performance of all critical components, including electrical, pneumatic, mechanical, and conveyor systems. Regular inspection and maintenance helps prevent unexpected downtime and extends equipment life, and any defects identified must be corrected before operating the machine.

    Maintenance Item

    Main Electrical Enclosure

    Un-coiler

    Loop Controller #1

    • Grease1.png

    Strip Feeder and Loop Controller #2

    Roll Former

    Cutoff

    Transfer Conveyor

    NOTES:

    PLEASE SIGN WHEN COMPLETED:

    Click here to sign
Source: Northeast Building Products (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.