Monthly Shear Cell Program & Sequence Audit

A Monthly Shear Cell Program & Sequence Audit is essential to ensure equipment is operating correctly and process parameters remain within defined standards. Regular audits help identify deviations early, improve consistency and repeatability, and reduce the risk of quality issues or unplanned downtime.
Wastequip - TX
07/31/2024

Monthly Shear Cell Program & Sequence Audit

    Part number audited

    Did robot fault when picking sheet from infeed table?

    • Yes
    • No
    • N / A

    Did robot camera detect sheet properly?

    • Yes
    • No
    • N / A

    Did robot fault when placing sheet on gravity table?

    • Yes
    • No
    • N / A

    Did sheet slide to gravity table datum?

    • Yes
    • No
    • N / A

    Did robot fault when picking sheet from gravity table?

    • Yes
    • No
    • N / A

    Did robot fault when placing sheet in mechanical shear?

    • Yes
    • No
    • N / A

    Did mechanical shear make cut on the first try?

    • Yes
    • No
    • N / A

    Did robot fault when moving sheet from mechanical shear?

    • Yes
    • No
    • N / A

    Did robot fault when placing sheet on infeed table?

    • Yes
    • No
    • N / A

    Did an auto stop trigger?

    • Yes
    • No
    • N / A

    Signature

    Click here to sign
Source: Wastequip - TX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.