AS24-06 Monthly Calibration

This monthly calibration procedure verifies that the power supplies and plug circuits at stations 120 and 130 are operating within specified voltage tolerances using a calibrated meter. Completing this calibration helps ensure reliable electrical performance, proper plug operation, and early detection of issues before they impact production.
TAC Manufacturing
12/09/2025

AS24-06 Monthly Calibration

This monthly calibration procedure verifies that the power supplies and plug circuits at stations 120 and 130 are operating within specified voltage tolerances using a calibrated meter. Completing this calibration helps ensure reliable electrical performance, proper plug operation, and early detection of issues before they impact production.

    Calibration Procedure

    40. Measure the voltage at the 24.00vdc power supply. (21.6vdc - 26.4vdc)

    • as24-0624vdc.PNG
    Meter name
    Unit

    50. Measure the voltage at the 12.00vdc power supply. (10.8vdc - 13.2vdc)

    • as24-0612vdc.PNG
    Meter name
    Unit

    60. Measure the voltage at the 12.00vdc power supply. (10.8vdc - 13.2vdc)

    • as24-0612vdc.PNG
    Meter name
    Unit
    • as24-06powerbutton.PNG
    • as24-06pageselect.PNG
    • as24-06powersupplybefore.PNG
    • as24-06powersupplyafter.PNG
    • as24-6100a.PNG
    • as24-6100b.PNG
    • as24-6110.PNG
    • as24-6110b.PNG
    • as24-6120.PNG

    130. In the station #120 box measure dc voltage between wire numbers 15896 and 4051 on the bottom side of the terminal block and document. (10.8vdc - 13.2vdc)

    • as24-6130.PNG
    Meter name
    Unit

    140. In the station #130 box measure dc voltage between wire numbers 15996 and 4052 on the bottom side of the terminal block and document. (10.8vdc - 13.2vdc)

    • as24-6140.PNG
    Meter name
    Unit
    • as24-6150.PNG
    • as24-6110b.PNG
    • as24-6110.PNG
    • as24-6170a.PNG
    • as24-6170b.PNG
    • as24-6180a.PNG
    • as24-6180b.PNG

    230. Enter the ID# of the voltage meter that was used.

    240. Sign Off

    Click here to sign

Source: TAC Manufacturing (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.