CY17-02 Monthly Calibration
This procedure outlines the required steps to perform the monthly calibration of machine power supplies for model CY17-02. Using a certified and calibrated voltage meter, the technician verifies that each power supply and control circuit is operating within its specified tolerance range. Completion of this procedure ensures equipment accuracy, safe operation, and proper documentation of calibration activities.
CY17-02 Monthly Calibration
Calibration Procedure
40. Measure the voltage at the 7.10vdc power supply. (6.9vdc - 7.3vdc)
Meter name
Unit
50. Measure the voltage at the 24.00vdc power supply. (23.8vdc - 24.3vdc)
Meter name
Unit
70. Connect the red meter lead to pin 1. (11.3vdc - 11.7vdc)
Meter name
Unit
80. Connect the red meter lead to pin 2. (9.8vdc - 10.2vdc)
Meter name
Unit
90. Connect the red meter lead to pin 3. (9.3vdc - 9.7vdc)
Meter name
Unit
100. Connect the red meter lead to pin 4. (7.7vdc - 8.1vdc)
Meter name
Unit
110. Connect the red meter lead to pin 5. (1.0vdc - 1.4vdc)
Meter name
Unit
120. Connect the red meter lead to pin 6. (10.9vdc - 11.3vdc)
Meter name
Unit
130. Connect the red meter lead to pin 7. (8.9vdc - 9.3vdc)
Meter name
Unit
140. Connect the red meter lead to pin 8. (3.8vdc - 4.2vdc)
Meter name
Unit
190. Enter the ID# of the voltage meter that was used.
200. Sign Off
Click here to sign
Source: TAC Manufacturing (Community Member)