Thermolator 3 Quarterly Preventive Maintenance
This quarterly Thermolator preventive maintenance is completed to confirm the unit is in safe working condition and performing as expected.
Thermolator 3 Quarterly Preventive Maintenance
This procedure covers the quarterly preventive maintenance of Thermolator 3, including a visual damage check, panel removal, and controller and component inspections. It also includes pressure switch testing and electrical inspection, repeated across the unit's Stationary and Lifters sections, with any corrective actions documented.
ANY DAMAGE
THERMOLATOR
This procedure outlines the quarterly inspection and maintenance tasks for the Thermolator unit, including panel removal, component checks, pressure switch testing, and electrical inspection. It ensures the unit operates efficiently and identifies any corrective actions needed.
Initial Setup
Check the pressure relief valve for necessary repairs
Controller Inspection
Check if the push buttons operate
Check if all the LEDs work
Check if the temperature readouts work
Component Checks
Pull thermocouples and check condition of deposit build-up
Check pump motor for noise indicating bad bearing
Check plumbing for leaks
Check the pump seals for leaks
Check the condition of the hoses and hose clamps
Pressure Switch Test
Check if the pumps shut off
Check if an alarm sounds
Check if the pump motor starts automatically
Electrical Inspection
Check the 480V plugs and outlets for wear
Finalization
Is corrective action needed?
If yes, list corrective actions and place the work order number in the comments section
Comments
Parts used
Maintenance technician signature
Click here to sign
STATIONARY
THERMOLATOR
This procedure outlines the quarterly inspection and maintenance tasks for the Thermolator unit, including panel removal, component checks, pressure switch testing, and electrical inspection. It ensures the unit operates efficiently and identifies any corrective actions needed.
Initial Setup
Check the pressure relief valve for necessary repairs
Controller Inspection
Check if the push buttons operate
Check if all the LEDs work
Check if the temperature readouts work
Component Checks
Pull thermocouples and check condition of deposit build-up
Check pump motor for noise indicating bad bearing
Check plumbing for leaks
Check the pump seals for leaks
Check the condition of the hoses and hose clamps
Pressure Switch Test
Check if the pumps shut off
Check if an alarm sounds
Check if the pump motor starts automatically
Electrical Inspection
Check the 480V plugs and outlets for wear
Finalization
Is corrective action needed?
If yes, list corrective actions and place the work order number in the comments section
Comments
Parts used
Maintenance technician signature
Click here to sign
LIFTERS
THERMOLATOR
This procedure outlines the quarterly inspection and maintenance tasks for the Thermolator unit, including panel removal, component checks, pressure switch testing, and electrical inspection. It ensures the unit operates efficiently and identifies any corrective actions needed.
Initial Setup
Check the pressure relief valve for necessary repairs
Controller Inspection
Check if the push buttons operate
Check if all the LEDs work
Check if the temperature readouts work
Component Checks
Pull thermocouples and check condition of deposit build-up
Check pump motor for noise indicating bad bearing
Check plumbing for leaks
Check the pump seals for leaks
Check the condition of the hoses and hose clamps
Pressure Switch Test
Check if the pumps shut off
Check if an alarm sounds
Check if the pump motor starts automatically
Electrical Inspection
Check the 480V plugs and outlets for wear
Finalization
Is corrective action needed?
If yes, list corrective actions and place the work order number in the comments section
Comments
Parts used
Maintenance technician signature
Click here to sign
Reviewed by
Click here to sign
Source: MTNA-A (Community Member)