CYH17-04 Monthly Calibration
This procedure outlines the monthly calibration steps for the CYH17-04 machine. Using a certified voltage meter, the technician verifies that each power supply is operating within its specified tolerance to ensure accurate performance and safe machine operation.
CYH17-04 Monthly Calibration
Calibration Procedure
40. Measure the voltage at 11.35vdc power supply. (11.15vdc - 11.55vdc)
Meter name
Unit
50. Measure the voltage at 24.00vdc power supply. (24vdc - 24.4vdc)
Meter name
Unit
60. Measure the voltage at 15.57vdc power supply. (15.25vdc - 15.75vdc)
Meter name
Unit
100. Enter the ID# of the voltage meter that was used.
110. Sign Off
Click here to sign