This procedure is a daily facility readiness checklist for the 2511 Building, verifying equipment condition and utilities across critical areas—scissor lift, refrigeration (coolers/freezers/spiral), air systems (compressor, filters, air make-up, in-floor heat), and process rooms (pack, sprinkler, ammonia). It records temperatures, confirms fan and system operation, checks for leaks and abnormal noise, and ensures final security (doors/shed locked) to maintain safe, compliant, and reliable operations.
Riverside Foods
10/07/2025

2511 Building Daily Checklist

This procedure is a daily facility readiness checklist for the 2511 Building, verifying equipment condition and utilities across critical areas—scissor lift, refrigeration (coolers/freezers/spiral), air systems (compressor, filters, air make-up, in-floor heat), and process rooms (pack, sprinkler, ammonia). It records temperatures, confirms fan and system operation, checks for leaks and abnormal noise, and ensures final security (doors/shed locked) to maintain safe, compliant, and reliable operations.

    Scissor Lift Inspection

    Check the scissor lift for any visible damage

    • Pass
    • Flag
    • Fail

    Check battery state and condition

    • Pass
    • Flag
    • Fail

    Ensure the scissor lift is operational

    • Pass
    • Flag
    • Fail

    Cooler C Temperature and Fans

    Enter the temperature of Cooler C

    Check if the fans in Cooler C are operational

    • Pass
    • Flag
    • Fail

    Freezer 4 Temperature and Fans

    Enter the temperature of Freezer 4

    Check if the fans in Freezer 4 are operational

    • Pass
    • Flag
    • Fail

    Freezer 5 Temperature and Fans

    Enter the temperature of Freezer 5

    Check if the fans in Freezer 5 are operational

    • Pass
    • Flag
    • Fail

    Air Compressor and Filters

    Check the air compressor for any unusual noises

    • Pass
    • Flag
    • Fail

    Inspect the filters for cleanliness

    • Pass
    • Flag
    • Fail

    In-floor Heat System

    Is the in-floor heat system on?

    • Yes
    • No
    • N / A
    if the answer is "oneOf [Yes]"

    Verify the in-floor heat system is functioning

    • Pass
    • Flag
    • Fail

    Air Make Up

    Check the air make up system for proper operation

    • Pass
    • Flag
    • Fail

    Pack Room Temperature and Evaporator Fans

    Enter the temperature of the pack room

    Check if the evaporator fans in the pack room are operational

    • Pass
    • Flag
    • Fail

    Sprinkler Room

    Check the oil level in the sprinkler room

    • Pass
    • Flag
    • Fail

    Hydraulics

    Inspect the hydraulic system for leaks.

    • Pass
    • Flag
    • Fail

    Spiral Temperature and Operation

    Enter the temperature of the spiral

    Check if the spiral is operating correctly

    • Pass
    • Flag
    • Fail

    Ice Machine

    Verify the ice machine is functional and producing ice

    • Pass
    • Flag
    • Fail

    Water Heaters

    Check the water heaters for proper operation

    • Pass
    • Flag
    • Fail

    Ammonia Room

    Inspect the ammonia room for any leaks

    • Pass
    • Flag
    • Fail

    Doors and Shed

    Ensure all doors and shed are closed and locked

    • Pass
    • Flag
    • Fail
Source: Riverside Foods (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.