Weekly Check - GL2 Cabling
The Weekly Check for GL2 cabling is a proactive procedure aimed at ensuring the integrity, functionality, and safety of cabling systems designated as GL2. Regular inspections help identify potential issues early, ensuring that the cabling infrastructure continues to operate efficiently without interruption or safety risks.
Weekly Check - GL2 Cabling
The Weekly Check for GL2 cabling is a proactive procedure aimed at ensuring the integrity, functionality, and safety of cabling systems designated as GL2. Regular inspections help identify potential issues early, ensuring that the cabling infrastructure continues to operate efficiently without interruption or safety risks.
Preparation
Ensure the GL2 has been unloaded and you are permitted to enter. Liase with Karl or Ahmed. Gather the following:
Visual Inspection
This section you will require both access to the GL2 Interior, and all 6 Boreas to GL2 Cables.
Broken or Bent or Damaged pins on GL2 Sockets
if the answer is "noneOf [PASS]"
If Damage has occured, immediately raise with a supervisor for verification. Place a hold on GL2 loading until damage has been inspected.
Broken or Bent or Damaged pins on GL2 Cable Ends
if the answer is "noneOf [PASS]"
If Damage has occured, immediately raise with a supervisor for verification. Place a hold on GL2 loading until damage has been inspected.
Cable Test
This section you will be placing the cables onto the testing rig and verifying the cables are working
Screw in the Boreas Connector and the GL2 connections as shown
Testing Cables
Press the silver button and ensure all 5 lights are shown. Repeat for the remaining cables.
if the answer is "noneOf [PASS]"
If Damage has occured, immediately raise with a supervisor for verification. Place a hold on GL2 loading until damage has been inspected.
Complete