2000 Hour Chicago Pneumatic Compressor Preventive Maintenance
This comprehensive PM ensures peak efficiency, maximizes the compressor's lifespan, protects your pneumatic tools, and prevents unexpected downtime. This procedure involves checking and cleaning the coolers and dryer condenser, inspecting and potentially cleaning or replacing the air filter element, checking the electric cabinet filter, and maintaining the electronic water drain by testing and cleaning it. Change oil and filter
2000 Hour Chicago Pneumatic Compressor Preventive Maintenance
This comprehensive PM ensures peak efficiency, maximizes the compressor's lifespan, protects your pneumatic tools, and prevents unexpected downtime. This procedure involves checking and cleaning the coolers and dryer condenser, inspecting and potentially cleaning or replacing the air filter element, checking the electric cabinet filter, and maintaining the electronic water drain by testing and cleaning it. Change oil and filter
LOCK OUT TAG OUT
Cooler and Condenser Check
Check and clean coolers if necessary
Check and clean condenser of dryer if necessary
Air Filter Inspection
Is the air filter element clean?
Is the air filter element damaged or heavily contaminated?
Electric Cabinet Filter Check
Is there a filter element in the electric cabinet?
Water Drain Maintenance
Oil and filter change
Source: 299 New Waverly (Community Member)