MTN 007 Auto packing Line Maintenance Procedure
The MTN 007 Auto Packing Line Maintenance Procedure outlines the systematic tasks required to inspect, clean, lubricate, and service the components of the automated packing system. This procedure ensures continuous, safe, and efficient operation of the line by preventing unplanned downtime, identifying wear and tear early, and preserving equipment longevity and product quality.
MTN 007 Auto packing Line Maintenance Procedure
The MTN 007 Auto Packing Line Maintenance Procedure outlines the systematic tasks required to inspect, clean, lubricate, and service the components of the automated packing system. This procedure ensures continuous, safe, and efficient operation of the line by preventing unplanned downtime, identifying wear and tear early, and preserving equipment longevity and product quality.
Filling machine
6 monthly
Loma Metal Detector 6 monthly
Turn table 6 monthly PM
Turn table Maintenance Procedure
Electrical Panel 6 Monthly Service
This procedure outlines the steps for servicing an electrical Panel every six months, including inspection, cleaning, maintenance, and documentation.
Electrical Panel 6 Monthly
Inspect For Any Damage (Burning, parts failure)
All work has been completed
Click here to sign
Source: dalesman (Community Member)
