Cyclotron Targetry Maintenance OP.0005

The purpose of this document is to provide the process for performing and reviewing of cyclotron target maintenance. Specifically, to ensure that the targets and associated components have been maintained, documents have been reviewed, and all actions were completed within designated timelines.
2 MX Main Demo
02/03/2023

Cyclotron Targetry Maintenance OP.0005

The purpose of this document is to provide the process for performing and reviewing of cyclotron target maintenance. Specifically, to ensure that the targets and associated components have been maintained, documents have been reviewed, and all actions were completed within designated timelines.

    Purpose / Scope: The purpose of this document is to provide the process for performing and reviewing of cyclotron target maintenance. Specifically, to ensure that the targets and associated components have been maintained, documents have been reviewed, and all actions were completed within designated timelines.

    Responsible: The site cyclotron engineer, and/ or personnel from the Technical Service Group (TSG), or responsible designee, is responsible for maintaining the cyclotron targets and associated components according to procedure. Site QA/QAS shall be responsible for understanding and verifying that this procedure is in place to assure conformance with the requirements stated herein. QA/QAS is responsible for verifying/reviewing that maintenance was completed. The site Facility Manager is responsible for ensur

    Schedule: Every in-use target shall receive periodic maintenance not to exceed every three (3) months, i.e., quarterly. This should be documented on Attachment 3, Cyclotron Targetry Preventive Maintenance Record.

    Equipment / Materials:

    Equipment

    Materials

    QTY

    SP #

    Procedure:

    A. Instructions

    1. In-use cyclotron targets are to be maintained as needed, not to exceed quarterly (i.e., every 3 months).

    2. In the event that the Target Insert does not come clean after multiple cleaning cycles, a soda blasting procedure may be employed.

    B. Documentation

    1. Use Attachment 3, Cyclotron Targetry Preventive Maintenance Record (or other suitable and validated electronic system) to document PM instances on each target.

    Document Originator & Reviewer Approval Signatures:

    Approval

    Name

    Title

    Signature

    Click here to sign

    Date

    Schedule:

    Equipment / Materials:

    Equipment

    Rebuild Parts List

    Part Name

    Part #

    QTY

    Materials

    Materials

    QTY

    SP #

    Work Instructions

    A. GE BTI Target

    CAUTION: Target is highly radioactive until Target Window removed. When Target Window is removed, immediately place in a sufficiently shielded location!

    2. Disassemble the Target.

    NOTE: Do NOT let solvent boil off which will leave a hard residue on the insert.

    a. Inspect Target Insert

    c. ** Clean Target Insert, SS Nipples, Target Window, and 023 & 007 O-rings with Alcohol heated to ~40°C (100°F) for an appropriate time; minimally, ~10 min*; to remove any residual acetone left on the surface of the insert.

    *Suggested but NOT required time. ** If using a single beaker, thoroughly clean the beaker between each step and rinse with next liquid. If using multiple beakers, rinse each beaker with the liquid it will contain.

    4. Reassemble Target

    5. Install target on Accelerator

    NOTE: NEVER connect the target to the cooling system until pressure testing has been completed. There is potential to pressurize the water cooing system with helium if there is a leak.

    B. IBA 18/9 BTI Target

    CAUTION: Target is highly radioactive until Target Window removed. When Target Window is removed, immediately place is a sufficiently shielded location!!

    2. Disassemble Target.

    NOTE: Do NOT let solvent boil off which will leave a hard residue on the insert

    9. ** Clean Target Insert, SS Nipples, Target Window, and 029 & 006 O-rings in heated Alcohol to ~40°C (100°F) for an appropriate time; minimally, ~10 min* to remove any residual acetone left on the surface of the insert.

    *Suggested but NOT required time **If using a single beaker, thoroughly clean the beaker between each step and rinse with next liquid. If using multiple beakers, rinse each beaker with the liquid it will contain.

    10. Reassemble Target

    C. Cyclotope Target

    CAUTION: Target is highly radioactive until Target Window removed. When Target Window is removed, immediately place it in a sufficiently shielded location!!

    2. Disassemble Target.

    NOTE: Do NOT let solvents boil off which will leave a hard residue in the Target Chamber

    a. Inspect Target Chamber

    NOTE: Target Window & 022 Buna-N O-ring can be cleaned by just wiping them off using alcohol

    *Suggested but NOT required time. ** If using a single beaker, thoroughly clean the beaker between each step and rinse with next liquid. If using multiple beakers, rinse each beaker with the liquid it will contain.

    4. Reassemble Target

    Attachment Approval Signatures:

    Approval

    Name

    Title

    Signature

    Click here to sign

    Date

    Revision & Update History:

    Revision

    Issue Date

    Reference #

    Details of Change

    Schedule:

    Equipment / Materials:

    Equipment

    Materials

    QTY

    SP #

    IMPORTANT NOTICE: The abrasive blasting equipment must ONLY have been used with Sodium Bicarbonate. ANY PREVIOUS MATERIALS RUN THROUGH BLASTER WILL RUIN THE INSERT.

    Section #16

    Work Instructions

    A. Soda Blast Procedure

    Note: If target is extremely contaminated or still has the presence of radioactive isotopes, sonicate in acetone for at least 10 min.

    Attachment Approval Signatures:

    Approval

    Name

    Title

    Signature

    Click here to sign

    Date

    Revision & Update History:

    Revision

    Update

    Issue Date

    Reference #

    Details of Change

    Equipment

    Target 1

    EQP or Serial Number:

    PM Completed Initials/ Date

    Click here to sign

    Target 2

    EQP or Serial Number

    PM Completed Initials/ Date

    Click here to sign

    Target 3

    EQP or Serial Number:

    PM Completed Initials/ Date

    Click here to sign

    Target 4

    EQP or Serial Number:

    PM Completed Initials/ Date

    Click here to sign

    Target 5

    EQP or Serial Number:

    PM Completed Initials/ Date

    Click here to sign

    Target 6

    EQP or Serial Number:

    PM Completed Initials/ Date

    Click here to sign

    Comments

    QA Reviewed by:

    Date:

Source: 2 MX Main Demo (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.