Back

Daily Critical Reliability Checklist

Critical items are meticulously recorded daily for safety and operational assurance.
24P DC Columbus - Cintas
03/05/2024

Daily Critical Reliability Checklist

Critical items are meticulously recorded daily for safety and operational assurance.

    *** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***

    All hazardous energy has been isolated using LOTO procedures?

    All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?

    Record Boiler Pressure: (75 to 100 PSIG)

    Meter name
    Unit

    Bottom and surface blow down completed

    • Yes
    • No
    • N / A

    Check boiler chemical levels (in-use and inventory)

    • Pass
    • Flag
    • Fail

    Test low water cut-off alarm. Document on FM Global Red Tag System

    • Pass
    • Flag
    • Fail

    Record Stack Temperature on Boiler. Max: 475 F

    Meter name
    Unit

    Ensure feed water pumps are running and feed water tank level is adequate

    • Pass
    • Flag
    • Fail

    Check boiler flame condition (should be mostly blue)

    • Pass
    • Flag
    • Fail

    Record Air Compressor Pressure (100-125 PSIG)

    Meter name
    Unit

    Record Air Compressor Airend Temperature

    Meter name
    Unit

    Check Compressor cooling air filter present/clean

    • Pass
    • Flag
    • Fail

    Check Compressor oil level is normal (range specified by OEM)

    • Pass
    • Flag
    • Fail

    Check air Dryer is running

    • Pass
    • Flag
    • Fail

    Check air tank blow-down is operating properly

    • Pass
    • Flag
    • Fail

    Inspect all water pumps for leaks

    • Pass
    • Flag
    • Fail

    Inspect integrity of shaker screen

    • Pass
    • Flag
    • Fail

    Record Tempered Water Temperature (70-100 F)

    Meter name
    Unit

    Record Hot Water Temperature (140-155 F)

    Meter name
    Unit

    Check water levels in hot and tempered storage tanks

    • Pass
    • Flag
    • Fail

    Check that EQ tank blower/mixer is running (if applicable)

    • Pass
    • Flag
    • Fail

    Check that pit mixer/blower is running (if applicable)

    • Pass
    • Flag
    • Fail

    Ensure wash alley trench screen is cleaned

    • Pass
    • Flag
    • Fail

    Record Temperature of City Water In

    Meter name
    Unit

    Record Temperature of City Water Out

    Meter name
    Unit

    Record Temperature of Waste Water In

    Meter name
    Unit

    Record Temperature of Waste Water Out

    Meter name
    Unit

    Calculate and Record Approach Reading (Approach = Waste Water In - City Water Out)

    Meter name
    Unit

    Record Process Water Hardness (after tempered or hot water tank if applicable). With plant softener 0-2 grains / Without plant softener<4 grains

    Meter name
    Unit

    Check wash alley chemical day tanks for proper level & operation

    • Pass
    • Flag
    • Fail

    Inspector's Signature

    Click here to sign
Source: 24P DC Columbus - Cintas (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.