Back

Weekend Inspections Day Shift

Use the guidelines below for the inspection of your oxidizer control panel.
Ahlstrom
04/07/2023

Weekend Inspections Day Shift

Use the guidelines below for the inspection of your oxidizer control panel.

    Date & Time

    Planned work & Breakdowns

    11 KV , 30 V Battery Checks

    Carry out the following Inspections on the assets listed:

    No.4 Substation - check mains light is on, mains power, battery visual check and press/hold test button for approx. 5 seconds and note down voltage.

    B6 Substation - check mains light is on, mains power, battery visual check and press/hold test button for approx. 5 seconds and note down voltage.

    B10 Substation – check mains light is on, mains power and check digital read out and note down.

    Fire Pump Batteries 1 & 2

    Carry out the following Inspections on the assets listed:

    Pump 1 Battery 1 Voltage and Charge level

    • Pass
    • Flag
    • Fail

    Pump 1 Battery 2 Voltage and Charge level

    • Pass
    • Flag
    • Fail

    Pump 1 Battery 3 Voltage and Charge level

    • Pass
    • Flag
    • Fail

    Pump 1 Battery 4 Voltage and Charge level

    • Pass
    • Flag
    • Fail

    Pump 2 Battery 1 Voltage and Charge level

    • Pass
    • Flag
    • Fail

    Pump 2 Battery 2 Voltage and Charge level

    • Pass
    • Flag
    • Fail

    Pump 2 Battery 3 Voltage and Charge level

    • Pass
    • Flag
    • Fail

    Pump 2 Battery 4 Voltage and Charge level

    • Pass
    • Flag
    • Fail

    Capacitor Load Check readings

    Carry out the following Inspections on the assets listed:

    Old Mill 1

    • Pass
    • Flag
    • Fail

    Old Mill 3

    • Pass
    • Flag
    • Fail

    Old Mill 4

    • Pass
    • Flag
    • Fail

    15A 1

    • Pass
    • Flag
    • Fail

    25A 1

    • Pass
    • Flag
    • Fail

    26A 1

    • Pass
    • Flag
    • Fail

    21 EB

    • Pass
    • Flag
    • Fail

    25 Cap Bank

    • Pass
    • Flag
    • Fail

    25 Cap Bank

    • Pass
    • Flag
    • Fail

    CS2 Earthing and bonding check, Visual.

    Carry out the following Inspections on the assets listed:

    Flange 1

    • Pass
    • Flag
    • Fail

    Flange 2

    • Pass
    • Flag
    • Fail

    Flange 3

    • Pass
    • Flag
    • Fail

    Flange 4

    • Pass
    • Flag
    • Fail

    Flange 5

    • Pass
    • Flag
    • Fail

    Flange 6

    • Pass
    • Flag
    • Fail

    Flange 7

    • Pass
    • Flag
    • Fail

    Flange 8

    • Pass
    • Flag
    • Fail

    Flange 8

    • Pass
    • Flag
    • Fail

    General

    • Pass
    • Flag
    • Fail

    Fire Detection Panel Status

    Carry out the following Inspections on the assets listed:

    B3 Fire panel – check status of panel, main power on and any faults/alarms.

    • Pass
    • Flag
    • Fail

    B10 Fire panel – check status of panel, main power on and any faults/alarms.

    • Pass
    • Flag
    • Fail

    B8 Fire panel – check status of panel, main power on and any faults/alarms.

    • Pass
    • Flag
    • Fail

    Chlorine units

    Carry out the following Inspections on the assets listed

    Krofta - Press the MENU key, then press the down ARROW key until the MAINT menu appears. Press ENTER. Remove the plug from the top hole of the colorimeter. 3 Colorimeter assembly. Gently insert a straightened paper clip into the hole at the top of the colorimeter and slowly pull out the stir bar. Insert a wooden or paper cotton-tipped swab* into the opening and move it up and down with a gentle scrubbing action, cleaning the interior surfaces of the colorimeter cell. Clean the stir bar with the cotton swab.

    • Pass
    • Flag
    • Fail

    Effluent Outfall - Press the MENU key, then press the down ARROW key until the MAINT menu appears. Press ENTER. Remove the plug from the top hole of the colorimeter. 3 Colorimeter assembly. Gently insert a straightened paper clip into the hole at the top of the colorimeter and slowly pull out the stir bar. Insert a wooden or paper cotton-tipped swab* into the opening and move it up and down with a gentle scrubbing action, cleaning the interior surfaces of the colorimeter cell. Clean the stir bar with the c

    • Pass
    • Flag
    • Fail

    Winder VSD’s filters

    Carry out the following Inspections on the assets listed:

    19 winder – clean drive panel filter or replace if damaged and beyond cleaning.

    • Pass
    • Flag
    • Fail

    20 winder – clean drive panel filter or replace if damaged and beyond cleaning.

    • Pass
    • Flag
    • Fail

    21 winder – clean drive panel filter or replace if damaged and beyond cleaning.

    • Pass
    • Flag
    • Fail

    22 winder – clean drive panel filter or replace if damaged and beyond cleaning.

    • Pass
    • Flag
    • Fail

    30 winder – clean drive panel filter or replace if damaged and beyond cleaning.

    • Pass
    • Flag
    • Fail

    Site VSD Panel Fillters

    1 Weekend Each Month

    AS Per Folder Clean - Replace

    • Pass
    • Flag
    • Fail

    Corrective Action

    Were any Checks Incomplete

    if the answer is "oneOf [Yes ]"

    If Not Why Not

    Is Any Follow up Work Required

    if the answer is "oneOf [Yes]"

    Remarks

    Are all guards and their fixing in place, secure and operational? (If NO, state reason)

    if the answer is "oneOf [No]"

    Remarks

    Any other Comments

Source: Ahlstrom (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.