Back

Extrusion Line Inspection Report

Full checkup of Extrusion Line
ALMONA PLASTICS
10/22/2022

Extrusion Line Inspection Report

Full checkup of Extrusion Line

    DATE

    EXTRUSION lINE

    EXTRUDER

    Barrel: Check for degree of wear and for damage.

    • Pass
    • Flag
    • Fail

    Heater bands: Check the clamping screws

    • Pass
    • Flag
    • Fail

    Thermo feeler: Check adjustment and clean

    • Pass
    • Flag
    • Fail

    Screw: Check the condition and wear

    • Pass
    • Flag
    • Fail

    Barrel cooling: Check blower and cooling air ducts for fastening out cleanness.

    • Pass
    • Flag
    • Fail

    Water cooling: check flow rate and filters

    • Pass
    • Flag
    • Fail

    Operator's panel: clean or exchange the filter.

    • Pass
    • Flag
    • Fail

    Reduction gear: grease and visual check for oil and water leakage.

    • Pass
    • Flag
    • Fail

    Reduction gear: change oil.

    • Pass
    • Flag
    • Fail

    CHANGE PUMPS BEARING

    • Pass
    • Flag
    • Fail

    Electrical cabinet: clean and check for damage

    • Pass
    • Flag
    • Fail

    REMARKS

    PICTURE AND VIDEO UPLOAD

    Add or drag pictures

    DIE HEAD

    Heating bands: Check the clamping screws

    • Pass
    • Flag
    • Fail

    Thermo feeler: Check adjustment and clean

    • Pass
    • Flag
    • Fail

    Stud bolts and screws: ALL MUST BE COVERED WITH A PROTECTIVE GREASE

    • Pass
    • Flag
    • Fail

    Electrical cabinet: clean and check for damage

    • Pass
    • Flag
    • Fail

    REMARKS

    PICTURE AND VIDEO UPLOAD

    Add or drag pictures

    VACUUM AND COOLING TANKS

    Water Filters: Clean

    • Pass
    • Flag
    • Fail

    Water level feelers and heat-sensitive feeler to be cleaned

    • Pass
    • Flag
    • Fail

    pumps: check for damage and clean

    • Pass
    • Flag
    • Fail

    Movement parts: grease

    • Pass
    • Flag
    • Fail

    Electrical cabinet: clean and check for damage

    • Pass
    • Flag
    • Fail

    REMARKS

    PICTURE AND VIDEO UPLOAD

    Add or drag pictures

    HAUL-OFF UNIT

    Electrical cabinet: clean and check for damage

    • Pass
    • Flag
    • Fail

    Pneumatic system:

    Check filter/lubricator oil level

    • Pass
    • Flag
    • Fail

    Check air level

    • Pass
    • Flag
    • Fail

    Check the cleanliness of filter/ lubrication

    • Pass
    • Flag
    • Fail

    Check for the condensation water in lubrication filter and tank

    • Pass
    • Flag
    • Fail

    Tracks:

    Check slide guide wear

    • Pass
    • Flag
    • Fail

    caps cleanliness

    • Pass
    • Flag
    • Fail

    check chain tension

    • Pass
    • Flag
    • Fail

    Chain lubrication

    • Pass
    • Flag
    • Fail

    Check lower track height adjustment control lubrication.

    • Pass
    • Flag
    • Fail

    REMARKS

    PICTURE AND VIDEO UPLOAD

    Add or drag pictures

    CUTTING UNIT

    Air filter: Drain condensate

    • Pass
    • Flag
    • Fail

    Lubricator: Check oil level and top up

    • Pass
    • Flag
    • Fail

    Air Tank: Drain condensation

    • Pass
    • Flag
    • Fail

    Running parts: Greasing

    • Pass
    • Flag
    • Fail

    Electrical cabinet: clean and check for damage

    • Pass
    • Flag
    • Fail

    REMARKS

    PICTURE AND VIDEO UPLOAD

    Add or drag pictures
Source: ALMONA PLASTICS (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.