EV Charging Points 1-10 of 5 units
This procedure outlines the weekly inspection and maintenance tasks for EV Charging Points 1-10, ensuring their integrity, connectivity, and functionality. It includes checks for signal strength, visual and functional inspections, internal cleaning, and electrical maintenance.
EV Charging Points 1-10 of 5 units
This procedure outlines the weekly inspection and maintenance tasks for EV Charging Points 1-10, ensuring their integrity, connectivity, and functionality. It includes checks for signal strength, visual and functional inspections, internal cleaning, and electrical maintenance.
Weekly Integrity Check
Check the integrity of the charging points for each double unit
Visual and Functional Inspection
Inspect the exterior for visual damage and ensure all warning labels are present and legible
Are the status indicators operating and displaying the correct status for each unit?
Check the condition of the charging socket, contacts, and socket flap for each unit
Ensure the access/cable lock is operational for each unit
Internal Inspection and Cleaning
Perform internal visual inspection for physical damage and heat degradation
Source: group55 Ltd (Community Member)
