C1 Turn Maintenance

This procedure covers routine checks and servicing of C1 Turn equipment to identify maintenance needs and support safe, efficient operation.
PGT - Indy
10/09/2026

C1 Turn Maintenance

The aim is to maintain the equipment’s condition and reliable performance through routine inspection and servicing. This maintenance helps identify wear, damage, and potential faults early, allowing timely corrective action to prevent unexpected breakdowns, minimize downtime, and extend equipment service life.

    Shifts Covering Turn

    After Mini-Turns: Ensure the vacuum system is ready to use BEFORE turn (CHECK ALL BARRELS & FILTERS)

    DD DC dp reading (If above 5.0 unit must be shut down)

    Vac DC dp reading (If above 5.0 unit must be shut down)

    4 HOURS BEFORE CAMPAIGN COMPLETION

    Alarms ? (Review campaign history)

    Snag Sheet Items / Review TPM board

    PM's due ? Calibrations due?

    DP Amp Draw (HWP required) and Oil Level Check

    Heater 1 L1 Amp Draw

    Meter name
    Unit

    Heater 1 L2 Amp Draw

    Meter name
    Unit

    Heater 1 L3 Amp Draw

    Meter name
    Unit

    H1 DP Amp Draw Even?

    • Yes
    • No
    • N / A

    H1 DP Oil Level

    CT L1 Amp Draw

    Meter name
    Unit

    CT L2 Amp Draw

    Meter name
    Unit

    CT L3 Amp Draw

    Meter name
    Unit

    CT Amp Draw Even?

    • Yes
    • No
    • N / A

    CT DP Oil Level

    Heater 2 L1 Amp Draw

    Meter name
    Unit

    Heater 2 L2 Amp Draw

    Meter name
    Unit

    Heater 2 L3 Amp Draw

    Meter name
    Unit

    H2 DP Amp Draw Even?

    • Yes
    • No
    • N / A

    H2 DP Oil level

    Vacuum pump oil (Check all levels and cond)

    G1↑

    G1↓

    G2↑

    G2↓

    Gun 1 Block Current

    Gun 2 Block Current

    Scrapers & Bellows ? (Verify condition )

    Ingot drive belts & sensors (inspect)

    TURN ITEMS (clean and inspect, functional test and repair as required) Front Half

    Please document the date & time the coat tank was vented.

    LOTO is required for servicing the load chambers. Please place your lock on the chamber that you are servicing

    • LOTO1.jpg

    Verify cable connections at the feedthrough on the bottom of the load chamber and connections at all 3 servo motors. Clean and wipe down all 3 assemblies

    Feeder bearing (spin test / flush / lube)

    Tri-shaft bearings (slide test / flush). Ensure tri-shaft wiper brushes are making full contact when returned to service.

    Verify both Butterfly and Tandem Tilt prox's are set to proper gap of .030, bracket is straight and turn on when flagged.

    Inspect rotation pinion and ring gear assy for wear / damage. Please insert a photo here of the rotation gears from CH 2 only, thanks.

    Water hoses (Inspect for excessive wear)

    Remove rake clamps, clean, tap bolt holes, install new bolts with boron nitride on threads

    Inspect Heat Shield on Stinger (ensure it's level)

    Using the rake arm no-go gauge, slide it over both wear bands for the short and long arms to verify that it does not go "on".

    • tool2.jpg
    • rakearmtoo.jpg

    Any special findings after servicing all 4 feeders?

    Offset

    Cond of graphite

    Offset

    Cond of graphite

    G1

    Meter name
    Unit

    G2

    Meter name
    Unit

    If Gun was changed Enter Gun position and serial #

    Blow out gun hood air filters each TURN

    Click here to sign

    Take picture of clean filters

    Add or drag pictures

    Back Half of TURN

    LOTO is required for entry into the Coat Tank. Please place your lock on the group box before servicing.

    • LOTO2.jpg

    Please document the date & time we were given the coat tank.

    Ingot feed jams last campaign? Heavy pitting? This is important to get right.

    Bore 1 [mm]

    Meter name
    Unit

    Bore 2 [mm]

    Meter name
    Unit

    Upper Crousel & Ingot Feed Bearings

    Lower Carousel & Ingot Feed Bearings

    CT shafts or Shutter Cables (Clean and inspect)

    Take before and after pic of trombone

    Add or drag pictures

    CT

    H1

    H2

    • ExceptableRailBeam.jpg
    • ExceptableSwitch.jpg
    • UnexeptableRailBeam.jpg
    • UnexceptableSwitch.jpg

    Please document the date & time we gave the coat tank back to production.

    Humidity Reading in the Room when closed up.(sensor next to computer)

    Notes / additional items serviced? How much time did that take? Should that work happen under a different WO?

    How long did pump down take? From they time they hit evac to the time it crossed over?

Source: PGT - Indy (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.