RM Plant - TURNHEAD FIR INSPECTION

This procedure is used to inspect the RM plant turnhead and to flag any damage or abnormal operation for repair.
SOVA - RMC - Titan America
03/11/2026

RM Plant - TURNHEAD FIR INSPECTION

This procedure outlines the inspection of the RM plant turnhead to confirm it is safe and operating correctly. It guides the inspector through checks of the surrounding steel, rotation, abnormal noise, liner wear, guards, and position indicators.

    Check surrounding steel for any cracks, bends or damage.

    • Pass
    • Flag
    • Fail

    Check if the unit rotates smoothly

    • Pass
    • Flag
    • Fail

    Listen for any abnormal noises

    • Pass
    • Flag
    • Fail

    Check liners for wear

    • Pass
    • Flag
    • Fail

    Check if guards are in place

    • Pass
    • Flag
    • Fail

    Verify turnhead position indicators are operational

    • Pass
    • Flag
    • Fail
Source: SOVA - RMC - Titan America (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.