Mixer Weekly PM

This procedure is used to inspect the mixers each week so leaks, low hydraulic levels, and faulty grounding or bonding are found and corrected before they cause downtime or a safety hazard.
IPS Adhesives - Durham
03/31/2026

Mixer Weekly PM

This procedure outlines the weekly preventive maintenance inspection of the mixers in the mix room to keep them safe and reliable. It guides the technician through checking hydraulic levels, water and oil leaks, grounding cable connections, and bonding cable continuity, with a pass, flag, or fail result for each.

    Check hydraulic levels

    • Pass
    • Flag
    • Fail

    Check for water leaks

    • Pass
    • Flag
    • Fail

    Check for oil leaks

    • Pass
    • Flag
    • Fail

    Check grounding cable connections

    • Pass
    • Flag
    • Fail

    Check bonding cable continuity

    • Pass
    • Flag
    • Fail
Source: IPS Adhesives - Durham (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.