Mixer Weekly PM
This procedure is used to inspect the mixers each week so leaks, low hydraulic levels, and faulty grounding or bonding are found and corrected before they cause downtime or a safety hazard.
Mixer Weekly PM
This procedure outlines the weekly preventive maintenance inspection of the mixers in the mix room to keep them safe and reliable. It guides the technician through checking hydraulic levels, water and oil leaks, grounding cable connections, and bonding cable continuity, with a pass, flag, or fail result for each.
Check hydraulic levels
Check for water leaks
Check for oil leaks
Check grounding cable connections
Check bonding cable continuity
Source: IPS Adhesives - Durham (Community Member)
