Back

Mix Room Press Weekly PM

Use this checklist each week to check the mix room presses for hydraulic oil leaks, low oil level, and bearing wear so problems are caught before they cause downtime.
IPS Adhesives - Durham
03/31/2026

Mix Room Press Weekly PM

This procedure outlines the weekly preventive maintenance inspection of the mix room presses, focusing on the hydraulic system and bearing condition. It guides the technician through checking for hydraulic oil leaks, checking the hydraulic oil level, and checking the condition of the bearings.

    Check for hydraulic oil leaks

    • Pass
    • Flag
    • Fail

    Check hydraulic oil level

    • Pass
    • Flag
    • Fail

    Check the condition of the bearings

    • Pass
    • Flag
    • Fail
Source: IPS Adhesives - Durham (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.