Sawmill Morning Startup (547)
This checklist ensures all machinery is safe and operational before production begins, preventing accidents and avoiding costly unplanned downtime from equipment failures.
Sawmill Morning Startup (547)
This checklist ensures all machinery is safe and operational before production begins, preventing accidents and avoiding costly unplanned downtime from equipment failures.
Inspect and clean out vibrator sawdust pickups
Top off sawmill HPU's
Woodkraft
Gang Edger
Auto
Stacker
Mini cant trimmer
Slab edger 2
Top off Salvage HPU's as needed
Deduster 1
Deduster 4
Board bundler lift table
Salvage 2 HPU
Deduster 2
Top off machine valve lubricators (Marvel mystery oil)
Woodkraft Hold down wheel
Slab edger 1 air supply
Auto pineapple wheel
Auto hold-over wheel
Stacker air supply
Board bundler air supply
Notes
Technician Signature
Click here to sign
Source: 547 Livermore Falls (Community Member)
