Sawmill Morning Startup (547)

This checklist ensures all machinery is safe and operational before production begins, preventing accidents and avoiding costly unplanned downtime from equipment failures.
547 Livermore Falls
11/14/2025

Sawmill Morning Startup (547)

This checklist ensures all machinery is safe and operational before production begins, preventing accidents and avoiding costly unplanned downtime from equipment failures.

    Inspect and clean out vibrator sawdust pickups

    Top off sawmill HPU's

    Woodkraft

    Gang Edger

    Auto

    Stacker

    Mini cant trimmer

    Slab edger 2

    Top off Salvage HPU's as needed

    Deduster 1

    Deduster 4

    Board bundler lift table

    Salvage 2 HPU

    Deduster 2

    Top off machine valve lubricators (Marvel mystery oil)

    Woodkraft Hold down wheel

    Slab edger 1 air supply

    Auto pineapple wheel

    Auto hold-over wheel

    Stacker air supply

    Board bundler air supply

    Notes

    Technician Signature

    Click here to sign
Source: 547 Livermore Falls (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.