PI-OP160 Gearbox Update
This procedure is used to replace a loader gearbox and verify its rack and pinion alignment so the loader stays balanced and operates reliably.
PI-OP160 Gearbox Update
This procedure outlines the replacement of a loader’s gearbox and motor, including modifying the mounting plate, assembling the coupling, and installing the new unit. It guides the technician through removing the old gearbox, marking and drilling the plate, assembling and installing the new gearbox, and checking the rack and pinion alignment.
Parts list of Gearbox
Remove the motor, then remove the gearbox along with the motor housing. Mark the alignment points to ensure the rack and pinion are properly aligned.
Due to differences in hole positions, additional hole machining is required on the plate. To ensure precise drilling, please mark the intended processing locations.
Drill holes precisely at the marked locations. Check to make sure the new plate fits after drilling. Screw hole M10-1.5 Pilot hole Φ8.6.
Attach the plate, gear, and motor housing to the gearbox. Please verify the orientation shown in the photo.
Check the photo and drawing to make sure you don’t put the washer in the wrong direction.
Install the gearbox and mount the motor. Access through the opening in the housing and tighten the coupling.
Adjust the loader alignment. Check for any misalignment in the rack and pinion. Misalignment can cause the loader to become unbalanced.