Back

Small Metform QPM

This procedure outlines quarterly preventive maintenance activities for the Small Metform to assess its condition and address maintenance needs for consistent performance.
SC - NBG Nucor
10/28/2026

Small Metform QPM

The aim of the Small Metform QPM is to maintain the equipment’s condition and performance through quarterly preventive maintenance, including inspections, cleaning, lubrication, and adjustments as required. This maintenance helps identify wear, damage, or faults early, reduce unexpected downtime, and support safe, reliable operation.

    Inspect the encoder for damage.

    • Pass
    • Flag
    • Fail

    Inspect and grease all guide wheels on the infeed side of the roll former.

    • Pass
    • Flag
    • Fail

    Inspect the tooling and tooling towers for damage.

    • Pass
    • Flag
    • Fail

    Blow out all metal shavings from the roll former.

    • Pass
    • Flag
    • Fail

    Grease the tooling stand bearings.

    • Pass
    • Flag
    • Fail

    Inspect all roll former bolts and nut for tightness.

    • Pass
    • Flag
    • Fail

    Grease the roll former motor cupping on the north side of the former.

    • Pass
    • Flag
    • Fail

    Check the roll formers gear box oil level.

    • Pass
    • Flag
    • Fail

    Inspect and lubricate the roll former drive chains and gears on the north side of the roll former.

    • Pass
    • Flag
    • Fail

    Inspect the condition of the press entry cylinder and lines.

    • Pass
    • Flag
    • Fail

    Inspect and grease the press die.

    • Pass
    • Flag
    • Fail

    Remove the flywheel guarding and grease the fittings on the flywheel

    • Pass
    • Flag
    • Fail

    Inspect the over all condition of the clutch. tighten the bolts on the clutch.

    • Pass
    • Flag
    • Fail

    Inspect the condition of the flywheel belts.

    • Pass
    • Flag
    • Fail

    Grease all press fittings.

    • Pass
    • Flag
    • Fail

    Inspect the exit pinch roller and grease the stand.

    • Pass
    • Flag
    • Fail

    Grease all 6 bearings on the material kick out.

    • Pass
    • Flag
    • Fail

    Fill all air oilers with air tool oil.

    • Pass
    • Flag
    • Fail

    Remove the exit conveyor guarding inspect all components condition and lubricate the chains.

    • Pass
    • Flag
    • Fail

    Inspect the exit conveyor motor and check the gear box oil level.

    • Pass
    • Flag
    • Fail

    Blow out the air filter in the electrical cabinet.

    • Pass
    • Flag
    • Fail

    • Pass
    • Flag
    • Fail

    • Pass
    • Flag
    • Fail
Source: SC - NBG Nucor (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.