This procedure describes the necessary steps of the bi-annual inspection and cleaning processes of the Lantech Wrapper. Preventive maintenance helps ensure it works well, lasts longer, and doesn't break down unexpectedly.
Schilling Cider LLC
06/03/2025

Lantech bi-annual inspection

This procedure describes the necessary steps of the bi-annual inspection and cleaning processes of the Lantech Wrapper. Preventive maintenance helps ensure it works well, lasts longer, and doesn't break down unexpectedly.

    Lantech Wrapper Lock Out Tag Out Procedure

    This procedure outlines the steps necessary to safely lock out and tag out the Lantech Wrapper to prevent injury from unexpected energization or release of stored energy during maintenance. It includes authorization, preparation, lock out, verification, and returning the machine to service.

    Preparation and Notification

    Identify sources of energy and Air pressure in relation to the maintenance task

    Notify all machine operators about the lockout

    Lock Out Procedure

    Wait for electricity to discharge (in minutes)

    Wait 5 minutes for electricity to discharge.

    Verification

    Verify the machine will not start up with an e-stop pressed

    • Yes
    • No
    • N / A

    Verify the machine HMI will not power on with the power switch in the off position

    • Yes
    • No
    • N / A

    Returning Machine to Service

    Main panel visual inspection

    Inspect panel for wear, ensure knobs are secure and tight.(set screws)

    • IMG_9185.JPG
    • Pass
    • Flag
    • Fail

    Safety Gate function test

    Ensure interlock is functioning as designed, hardware is torqued and tight and gate locks, and locks.

    • IMG_9193.JPG
    • Pass
    • Flag
    • Fail

    Wrap arm and roller carriage visual

    Inspect limit switches for wear and play, ensure all hardware is torqued, electrical connections secure and tight.

    • IMG_9178.JPG
    • Pass
    • Flag
    • Fail

    Air valve visual inspection

    Inspect for leaks, loose wires, solenoid lock screws for tension, clean filters/breathers.

    • IMG_9184.JPG
    • Pass
    • Flag
    • Fail

    Lantech pallet conveyors

    Inspect chains and guides for stretch/tension and wear.

    • Pass
    • Flag
    • Fail

    Upper wrap mast bearing inspection

    • IMG_91921.JPG
    • Pass
    • Flag
    • Fail

    Upper pully and belt inspection

    Inspect belt for wear, cracks, or missing teeth, inspect pullies for wear, play and tension.

    • IMG_9190.JPG
    • Pass
    • Flag
    • Fail

    Upper drive motor

    Remove brushes and blow out motor

    • IMG_9191.JPG
    • Pass
    • Flag
    • Fail

    Hotwire

    Inspect hotwire for damage, ensure proper tension, clean and clear of debris

    • IMG_9194.JPG
    • Pass
    • Flag
    • Fail

    Suction cups and vacuum filters

    Inspect for wear and damage

    • IMG_9183.JPG
    • Pass
    • Flag
    • Fail

    Lower air ram, vacuum generator

    Inspect for leaks, ensure clean and clear of debris

    • IMG_9182.JPG
    • Pass
    • Flag
    • Fail
Source: Schilling Cider LLC (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.