Installation Checklist ORORA-HS-FO-09-01-02
This checklist is provided as a guide and not intended to be conclusive. Other factors may need to be considered that apply specifically to the project at hand and should be included in section “G” of this checklist.All Actions arising in the checklist are to be transferred into a Corrective Action plan.ORORA-HSE-FO-09-01-02Version 1Issued: 06-01-2021Reviewed: Initial VersionRevision Date: 06-01-2021
Installation Checklist ORORA-HS-FO-09-01-02
The aim of the Installation Checklist ORORA-HS-FO-09-01-02 is to verify that installation work is complete, meets specified requirements, and is ready for handover or commissioning. It supports consistent checks, documentation of outstanding issues, and timely corrective action to promote safe and reliable operation.
Procedure Max Score: 24
Additional Assessors (if any)
Persons Consulted (if any)
Statutory Requirements
Have appropriate authorities been notified (as required)?
Are emergency procedures designed to deal with varying stages of construction? Is the emergency control team briefed accordingly?
Are emergency First Aid facilities in place? Do staff know how to get first Aid assistance?
Is there a process for contractors and employees to report all incidents and accident?
Health and Safety Committee and or Health and Safety Representative/s are consulted and involved as appropriate in promoting site health and safety?
Have contractors required to work on site been inducted?
Have appropriate amenities been provided for all workers on site?
Has a building debris and rubbish management plan been put in place?
Have all building and other permits been obtained?
Final Comments and Recommendations?
Hazard Identification
A process for issuing and monitoring permits to work is in place, i.e. Hot work, working from heights, confined spaces?
All employees on site know how to report a hazard – know what action to take?
If the construction site is a shared work environment, then are appropriate measures in place to ensure all risks are reduced?
Restricted areas have been identified and controls and signage are in place?
Has the site construction areas been adequately separated and isolated from the public and other work areas?
Building Requirements
Have the building essential services been identified and is the maintenance program in place?
Are protective or emergency systems required if all or part of equipment fails?
Is construction as designed?
Communication
Has a process for reporting and discussing unplanned events been established?
Have all employees and contractors working on site been inducted to the site general OHS requirements and emergency procedures?
Are pre-start up Team talks conducted?
Has a process for keeping employees, safety committee representatives and contractors informed of work progress been developed and implemented?
Visitor & Contractor Management
Is a contractor and visitor management process in place? I.e. Visitor register, Contractor register and Induction.
Consultation
Will the construction affect the safety and health of any other department, person, or neighbour; if yes has a consultation process been established?
Other Issues
Other: Does this project impact on the site Insurance- Fire and Loss Prevention requirements? If so, has the project been discussed with the Orora Risk and Assurance Manager?
Source: DFW Distribution - Orora Packaging (Community Member)