Pacsea Engr. Daily PM - Cranes (Inspection)
Daily crane inspections catch wear and malfunctions early, which keeps lifting operations safe for everyone on the floor.
Pacsea Engr. Daily PM - Cranes (Inspection)
This procedure covers the daily inspection and preventive maintenance of cranes, starting with LOTO and PPE checks and then inspecting the hooks, latches and wire ropes. It also covers testing the brakes, limit switches, controls and alarms, and recording any damage, corrective actions and follow-up work orders.
Safety Compliance
Ensure LOTO (Lockout/Tagout) procedures are followed, verify that all machinery is properly locked and tagged out before beginning maintenance
Employees must wear all required PPE while performing this procedure.
Inspection Checklist
Check for cracks, twisting, or throat opening distortion; ensure safety latches close fully.
Inspect for broken strands, kinks, crushing, or bird-caging.
Test hoist and travel brakes under a light load to confirm no drift occurs.
Test upper and lower travel limits at slow speed before standard operations.
Verify pendant/radio pushbuttons work properly and test the emergency stop, horn, or warning lights
Corrective Action
Damage Found?
if the answer is "oneOf [Yes]"
Notify your supervisor or manager immediately
If corrective actions are required, please provide a detailed description of the issues found and list any follow-up work order numbers created.
Work Completed
Date Performed
Your Intials
Click here to sign
Source: Kodiak - Pacific Seafood (Community Member)
