Monthly Plastisol 2 P.Ms
This procedure is used to inspect and clean the Plastisol 2 Line each month so that the equipment keeps operating safely and efficiently.
Monthly Plastisol 2 P.Ms
This procedure outlines the monthly maintenance tasks for inspecting and ensuring the proper functioning of various components of the Plastisol 2 Line, including the feeder bowl, vibrators, air lines, feed wheel, drive mechanism, safety guards, electrical panel, and UV bulbs.
Feeder Bowl Inspection
Inspect the Feeder Bowl for Cracks and vibratory action
Vibrators Check
Check that the Vibrators are working correctly
Air Lines and Regulators Inspection
Inspect the Air lines and regulators for any replacements needed
Feed Wheel and Line Belt Condition
Check the condition of the Feed wheel and Line belt
Recommend replacements if in poor condition
Drive Mechanism and Applicator System Inspection
Inspect the condition of the Drive mechanism for the belt and the Applicator system
Inspect all fasteners (bolts and nuts) for strength
Inspect the Drive tensioning and Integrity
Machine Safety Guards Check
Check the integrity of the machine safety guards
Main Electrical Panel Inspection
Inspect the Main Electrical Panel
Check the Line for exposed/burnt wiring
UV Bulbs Inspection
Inspect the condition of the UV Bulbs
Verify the Luminosity of the UV Bulbs
Clean hoses and connectors
Check and clean high temperature hoses for dry and oily sediments, and metallic components
Source: H.B Fuller Co. - Northbrook IL (Community Member)
