Pre-Turnover Chilled Water
The Pre-Turnover Chilled Water System Check involves a comprehensive inspection and verification of the chilled water system components and operation prior to final handover to the building owner or operations team. This ensures that all equipment, piping, controls, and safety systems are correctly installed, functionally tested, and ready for full operational use.
Pre-Turnover Chilled Water
The Pre-Turnover Chilled Water System Check involves a comprehensive inspection and verification of the chilled water system components and operation prior to final handover to the building owner or operations team. This ensures that all equipment, piping, controls, and safety systems are correctly installed, functionally tested, and ready for full operational use.
Is chiller online (>0 compressors running)
if the answer is " "
Are there any alarming conditions on any of the chillers
if the answer is "oneOf [Yes]"
What is the Name of the Alarm
if the answer is "oneOf [Yes]"
Perform the following
What is Chilled Water Supply Temp to WIng 1
if the answer is "> 45 "
Perform the following
What is Chilled Water Supply Temp to CUB
if the answer is "> 52 "
Perform the following
Check refrigerant monitor readings on control panel PNL-RFM1 and PNL-RFM2. Are any above 0 PPM
if the answer is "oneOf [Yes]"
Make a note of which chiller and contact
Source: KSPA1 - PECNA Organization (Community Member)