AHU Quarterly Maintenance Procedure
The aim of the AHU (Air Handling Unit) Quarterly Maintenance Procedure is to maintain optimal air quality, system efficiency, and operational reliability by performing scheduled preventive maintenance on the unit. Please ensure that all steps in the procedure are completed, and include comments in the project management system listing the results.
AHU Quarterly Maintenance Procedure
The aim of the AHU (Air Handling Unit) Quarterly Maintenance Procedure is to maintain optimal air quality, system efficiency, and operational reliability by performing scheduled preventive maintenance on the unit. Please ensure that all steps in the procedure are completed, and include comments in the project management system listing the results.
Initial Site Inspection. Time - 5 Min.
Initial Site/Safety Survey
Please Complete the Check Boxes on all work
Site Safety Survey
Safety Survey
Lockout Tagout Has Been Performed Procedure
LOTO Print to Fill Form
Lockout/Tagout has been performed.
Review Diagnostics. List active faults. Time - 5 min.
Visual Electrical Inspection. List any issues found in comments and make repairs. Time - 5 min.
Visual Inspection for Abnormality, Damage and Missing Hardware. Time - 5 min.
Verify Operating Voltages. Time - 10 min. Please list voltages below.
Review Operation. Time - 10 min.
Source: Mt. Dora - Curaleaf (Community Member)