Decommission of Mead 1250SX - Westrock
This procedure is used to shut down, isolate, disconnect, and remove the Mead 1250SX safely, with each step initialed and documented.
Decommission of Mead 1250SX - Westrock
This procedure outlines the safe decommissioning of the Mead 1250SX machine (Westrock) so it can be removed and disposed of in line with safety and environmental requirements. It guides the technician through pre-decommissioning checks, equipment shutdown, lockout/tagout (LOTO), utility disconnection, machine preparation, equipment removal, documentation, and area cleanup, followed by technician and manager sign-off.
Pre-Decommissioning
technician must initial each box to ensure accountability and documentation for who performed specific tasks.
Equipment Shutdown
technician must initial each box to ensure accountability and documentation for who performed specific tasks.
Lockout / Tagout (LOTO)
technician must initial each box to ensure accountability and documentation for who performed specific tasks.
Utility Disconnection
technician must initial each box to ensure accountability and documentation for who performed specific tasks.
Machine Preparation
technician must initial each box to ensure accountability and documentation for who performed specific tasks.
Equipment Removal
technician must initial each box to ensure accountability and documentation for who performed specific tasks.
Documentation
technician must initial each box to ensure accountability and documentation for who performed specific tasks.
Area Cleanup
technician must initial each box to ensure accountability and documentation for who performed specific tasks.
Final Sign-Off
Maintenance Technician
Click here to sign
Final Sign-Off
Maintenance Manager/Planner
Click here to sign
Source: The Odom Corporation (Community Member)
