Bag House 6 Monthly Emissions Inspection and Test
This procedure outlines the steps for conducting a 6-monthly emissions inspection and test on the Bag House, including visual inspections, sensor and control checks, function tests, and confirmation of alarm set points.
Bag House 6 Monthly Emissions Inspection and Test
This procedure outlines the steps for conducting a 6-monthly emissions inspection and test on the Bag House, including visual inspections, sensor and control checks, function tests, and confirmation of alarm set points.
Pre-Inspection Information
Enter Valmont Site information
Add or drag pictures
Visual Inspection
Check for any visual stack emissions
Inspect the stack for any visible emissions.
Sensor and Control Inspection
Inspect Goyen Particulate Emission Monitoring System Sensor
System and Control Panel Checks
Mode - "N" (Normal Operation
Normal Operating Dust level - 5% (1 LED Bar)
Dust level when Bag Pulse - 5% (1 LED Bar)
Delay Setting - "3"
Alarm 1 Trip Set Point 75%
Alarm 2 Trip Set Point 100%
Function Test
Conduct Function Test
Sensor Test Before Clean Expected result 40% - 60%
Sensor Test After Clean Expected result 40% - 60%
Gain / Span Simulation Expected result 90% - 100%
Detailed Maintenance Inspection Checks
Perform Maintenance Checks
Perform Inspection Checks
Alarm Set Points
Post-Inspection Actions
Contact Supervisor if there are any issues
Confirmation and Signature
Signature
I affirm that the information contained on this checklist is true and accurate to the best of my knowledge.
Click here to sign
Source: Hexham NSW - Valmont Coatings - APAC (Community Member)