Daily Hotmelt Inspection
A daily inspection of the hotmelt system to verify temperature accuracy, adhesive supply, and component condition, ensuring reliable and consistent adhesive application throughout each production shift.
Daily Hotmelt Inspection
This procedure outlines the daily inspection tasks for the Laminator Hot Melt Alpha DTX, including checks on length encoders, hotmelt assembly, UV light fixtures, atomizing air, adhesive valves, rollers, and rewind gears. Each task requires a pass/fail check, and the procedure concludes with an inspector sign-off.
Length Encoder(s) Inspection
Check length encoder(s) for build-up. Clean, if necessary
Hotmelt Assembly Inspection
Check hose connections and valves for leaks. Tighten, if necessary
Black Light Inspection
Confirm UV light fixture is functioning and positioned correctly
Atomizing Air Inspection
Confirm all atomizing air is set between 8 and 15 PSI
Confirm ALL gauges and regulators are functional
Adhesive Valve Evaluation
List any malfunctioning valves in the comments section
Roller Inspection
Check for adhesive or fiberglass build-up. Clean, if necessary
Rewind Gear Inspection
Confirm gear alignment. Realign, if necessary
Inspect for worn teeth
Photo of cleaned encoder wheel / rollers
Add or drag pictures
Inspector Sign-Off
Click here to sign