A bi-weekly mechanical preventive maintenance check of the Gyoza conveyor to inspect, lubricate, and service all critical belt, drive, and tension components, ensuring consistent conveyor performance and minimizing the risk of unplanned downtime or product handling disruptions during Gyoza production operations.
Fine Choice Foods
03/26/2026

Bi-Weekly Gyoza Conveyor Mechanical PM

This procedure outlines the steps for performing bi-weekly mechanical preventive maintenance on the Gyoza shuttle and recycle conveyor systems, including lockout, inspection, cleaning, adjustment, and verification. It helps ensure the equipment operates reliably, identifies wear or damage early, and supports safe, sanitary production conditions.
    • CaptureSC.PNG

    Inspect shuttle conveyor drive sprockets for wear, damage, and alignment. Verify set screws are tight.

    Check the shuttle belt for signs of wear, fraying, or damage.

    Inspect drive rollers for powder dust. Clean if present. Excessive powder dust can effectively increase roller size, causing belt stretch and bearing stress, leading to premature damage or failure. Note that bearings are sealed and should be replaced if they've run out of grease.

    • Capture.PNG

    Check bearings for rolling noise or shakiness. Replace sealed bearings if issues are found or if they've lost lubrication

    Inspection of the recycle conveyor belt

    Inspect the recycle belt for signs of wear, fraying, or damage (cut marks). check the center guide track for any damage.

    • Capture1.PNG

    Check bearings for noise, rust, or dryness. Inspect rollers for dust and wear, and clean. Verify shaft condition. Adjust belt tension carefully to avoid damaging bearings.

    • Capture2.PNG

    After completing preventive maintenance (PM), run the shuttle belt & recycle belt and verify its alignment. Also ensure equipment is cleaned and sanitized post PM and no housekeeping is completed before leaving site.

    Click here to sign

    Section #2

    Check pusher appearance for any cracks, wear or damage, replace it if needed

    Pusher assembely

    • Bluepusher.png
    • Gyozapusher.jpeg
    • Pushbarinspection.png

    Upload pictures of all sections for records

Source: Fine Choice Foods (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.