A monthly preventive maintenance check of all paint equipment and systems to inspect, clean, and service critical application and delivery components, ensuring consistent coating performance and minimizing the risk of unplanned downtime or quality deviations during paint operations.
TN - Kirby Building Systems - NBG Nucor
05/15/2026

Monthly PM Paint

This procedure outlines the steps for a monthly inspection and maintenance of the paint system, ensuring all components are functioning correctly and safely. It includes safety preparations, detailed inspections of the air supply system, paint pump, recirculating pump, hoses, electrical safety, and housekeeping. Each section requires a pass/fail evaluation, notes, and photo documentation if issues are found. The procedure concludes with a final verification and signature.

    Safety & Preparation

    Ensure safety measures are in place

    Air Supply System

    Inspect air supply system components

    Air Supply System Inspection

    • Pass
    • Flag
    • Fail

    Notes

    Add pictures if any flags or fail issues

    Add or drag pictures

    Paint Pump (Graco Air‑Operated)

    Inspect paint pump components

    Paint Pump Inspection

    • Pass
    • Flag
    • Fail

    Notes

    Add pictures if any flags or fail issues

    Add or drag pictures

    Recirculating Pump & Paint Flow System

    Inspect recirculating pump and paint flow system

    Recirculating Pump & Paint Flow System Inspection

    • Pass
    • Flag
    • Fail

    Notes

    Add pictures if any flags or fail issues

    Add or drag pictures

    Hoses, Spray Lines & Accessories

    Inspect hoses, spray lines, and accessories

    Hoses, Spray Lines & Accessories Inspection

    • Pass
    • Flag
    • Fail

    Notes

    Add pictures if any flags or fail issues

    Add or drag pictures

    General Electrical Safety Inspection (Fans, Extension Cords, Equipment)

    Inspect electrical safety components

    General Electrical Safety Inspection

    • Pass
    • Flag
    • Fail

    Notes

    Add pictures if any flags or fail issues

    Add or drag pictures

    Housekeeping & Area Condition

    Verify housekeeping and area condition

    Housekeeping & Area Condition Inspection

    • Pass
    • Flag
    • Fail

    Notes

    Add pictures if any flags or fail issues

    Add or drag pictures

    Final Verification

    Perform final verification steps

    Notes

    Add pictures if any flags or fail issues

    Add or drag pictures

    Completed By

    Click here to sign
Source: TN - Kirby Building Systems - NBG Nucor (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.