CNV-P01 - Multi Folder Vacuum System Monthly Inspection
A monthly inspection of the CNV-P01 Multi Folder Vacuum System to evaluate and service all critical vacuum pump, suction line, filter, and drive components, ensuring consistent vacuum performance and minimizing the risk of unplanned downtime or folding quality deviations during production operations.
CNV-P01 - Multi Folder Vacuum System Monthly Inspection
This procedure outlines the monthly inspection tasks for the CNV Multi Folder Vacuum System, including oil level checks, filter inspections, noise and vibration assessments, belt and gauge inspections, and documentation of work and materials used.
Oil Level and Condition Inspection
Inspect for discolored/contaminated oil
Filter and Noise Inspection
Inspect filter and clean/replace as needed
Check for unusual noise, vibration, or hot operation
Belt and Gauge Inspection
Inspect belts for tension and wear
Inspect gauges to ensure correct readings
Work & Materials Required for Maintenance Schedule
List item description, quantity, SAP number, and part number
Completed Work
Enter date and completed time
Describe actual work performed and notes
Actual Materials Used
List item description, SAP number, and part number
Technician Information
Enter technician name
Technician signature
Click here to sign
Enter date
Asset Information: 07. P01-Vacuum System-Multifolder
Source: Sofidel America - Haines City (Community Member)
