Conveyor PM - Roller
This procedure outlines the preventive maintenance steps for conveyor rollers to help ensure smooth, reliable operation. It focuses on inspecting rollers, drive components, belts, bearings, and guards to reduce wear and prevent unexpected downtime.
Conveyor PM - Roller
A scheduled preventive maintenance check of the Fife guide system to inspect and service all critical sensor, actuator, alignment, and control components, ensuring consistent web guiding accuracy and minimizing the risk of misalignment-related defects or unplanned downtime during production operations.
Check each individual conveyor roller condition and bearings
Inspect drive sprockets
Check / Adjust chain tension
Lubricate all bearings
Inspect V-Belt or flat belt that drives conveyor rollers
Check V-belt guide pulleys - Make sure grooves are clean, groove is not worn and Bearings
Inspect V-Belt Jack shaft bearings, journal for wear and Lubricate bearings
Blow out all yard material
Make sure all gaurds are secure and proper
Inspect and note any additional issues with unit
Clean up area around conveyor and wipe down grease fittings
Source: Mannington - Calhoun (Community Member)
