Heading Machine PM
This procedure is used to inspect and lubricate the heading machine every two months so wear in the belts, drive, brake, and lubrication systems is caught before it causes downtime.
Heading Machine PM
This procedure outlines the bi-monthly maintenance inspection of the heading machine to keep it running safely and efficiently. It guides the technician through checking the V-belts, lubrication systems and oil pump, motor, grease fittings, brake, main drive gear, main electrical panel, and conveyor system.
V-Belt Inspection
Oil Pump and Filter
Brake Check
Main Drive Gear
Source: Saturn Fasteners (Community Member)
